Degating Setup Options
Degating provides the following setup option:
Disable Handling Time: By default, handling labor time is based on values looked up by the mass (see Labor and Setup Costs for Sand Casting) in the lookup table tblHandlingTimes. Set his setup option to true to override the default and specify that no handling time is required, because the process does not require that the part is moved from another station.