Manufacturing process routing tree/table

The Manufacturing Process tree/table shows the sequence of steps required to manufacture a component.

Each manufacturing step may include further operations. Operations are organized by manufacturing technique. You can drill down into the GCDs for each specific operation.

Each manufacturing step presents iconic status and user input indicators. The status indicator displays a red, yellow, or green icon to indicate an error, warning, or success status. The user input indicator provides a green user icon to indicate that you have made an explicit component or process level edit, for example, machine selection or Process Setup maintenance).

The following icons are used in the routing tree/table:

Icon    

Usage

An operation

An operation selected by aPriori

An operation selected by you

Multiple operations

Multiple operations selected by aPriori

Multiple operations selected by you

A sub-operation selected by aPriori

A sub-operation selected by you

A GCD

A GCD selected by aPriori.

A GCD selected by you.

Multiple GCDs

Multiple GCDs selected by aPriori

Multiple GCDs selected by you.

 

A status indicator in the Status column shows the costing status of the operation:

  • Green: Costing completed successfully.

  • Yellow: Costing succeeded with a warning. Typically, a warning means that the requested operation could not be used costing but costing succeeded with an alternative operation.

  • Recosting failed.