Material Cost

Material Cost = Total Material Cost from Child Operations + Scrap Cost

Per-part material cost is the sum of the following:

  • Total material cost from child operations: sum of the material costs accounted for by the Layer Material child operations. There is one occurrence of the Layer Material operation for each Layer GCD in the part. For a given occurrence, which materials are accounted for depends on the type of layer associated with the occurrence. See the formulas below.

  • Scrap cost: see formula.

Material Cost Non-bottom CU =
(Copper Panel Cost + Prepreg Panel Cost) /
Number of Boards per Panel

The Layer Material operation for a Solo CU layer that is directly above prepreg (that is, a CU layer that is not the board’s bottom layer) accounts for the cost of both the copper and the prepreg beneath it. It depends on the following:

  • Copper panel cost: see formula for Default Copper Panel Cost. Users can override the default with the setup option Panel Raw Material Cost.

  • Prepreg panel cost: see formula for Default Prepreg Panel Cost. Users can override the default with the setup option Panel Raw Material Cost.

  • Number of boards per panel

Material Cost 2PT =
2-Ply Core Panel Cost / Number of Boards per Panel

The Layer Material operation for the top layer of 2-ply core (that is, a 2PT layer) accounts for the cost of the whole core: the two copper layers and the core insulator. It depends on the following:

  • 2-ply panel cost: see formula for Default 2-Ply Panel Cost. Users can override the default with the setup option Panel Raw Material Cost.

  • Number of boards per panel

Material Cost 2PB = Prepreg Panel Cost /
Number of Boards per Panel

The Layer Material operation for the bottom layer of a 2-ply core (that is, a 2PB layer) accounts only for the material cost of the prepreg beneath the layer. It depends on the following:

  • Prepreg panel cost: see formula for Default Prepreg Panel Cost. Users can override the default with the setup option Panel Raw Material Cost.

  • Number of boards per panel

Material Cost Bottom = Copper Panel Cost /
Number of Boards per Panel

Board’s bottom layer: The Layer Material operation for a multi-layer board’s bottom layer (a CU layer with no prepreg beneath it) accounts for the cost of just the copper. It depends on the following:

  • Copper panel cost: see formula for Default Copper Panel Cost. Users can override the default with the setup option Panel Raw Material Cost.

  • Number of boards per panel

Material Cost 1-Ply = 1-Ply Core Panel Cost /
Number of Boards per Panel

The Layer Material operation for the copper layer of 1-ply core (that is, a 1P layer) accounts for the cost of the core: the copper layer and the core insulator. It depends on the following:

  • 1-ply core panel cost: see formula for Default 1-Ply Panel Cost. Users can override the default with the setup option Panel Raw Material Cost.

  • Number of boards per panel

Default Copper Panel Cost =
Copper Panel Cost per Mass * Panel Mass

Copper panel default cost is the product of the following:

  • Copper panel cost per mass: specified under Unit Cost in the materials table for copper with the current layer’s thickness; see Layer GCD.

  • Panel mass: product of the following:

    • Panel area: product of length and width; see PCB Panel Size.

    • Panel thickness: specified under Overall Thickness in the materials table for copper with the current layer’s thickness; see Layer GCD.

    • Panel density: specified under Combined Density in the materials table for copper with the current layer’s thickness; see Layer GCD.

Default Prepreg Panel Cost =
Prepreg Panel Cost per Area *
Panel Area * Number of Prepreg Sheets

Prepreg panel default cost is the product of the following:

Default 2-Ply Core Panel Cost =
2-Ply Core Panel Cost per Mass *
Panel Mass * Core Cost Factor

The default cost for 2-ply core panel is the product of the following:

  • 2-ply core panel cost per mass: specified under Unit Cost in the Material Stocks table for a 2-ply core with the thickness of the current copper layer; see Layer GCD—and the thickness of the core insulator beneath the current copper layer; see Core Insulator Thickness.

  • Panel volume: product of the following:

    • Panel area: product of length and width; see PCB Panel Size.

    • Panel thickness: specified under Overall Thickness in the material stocks table for a 2-ply core with the thickness of the current copper layer; see Layer GCD—and the thickness of the core insulator beneath the current copper layer; see Core Insulator Thickness.

    • Panel density: specified under Combined Density in the material stocks table for a 2-ply core with the thickness of the current copper layer; see Layer GCD—and the thickness of the core insulator beneath the current copper layer; see Core Insulator Thickness.

Default 1-Ply Core Panel Cost =
1-Ply Core Panel Cost per Mass *
Panel Mass * Core Cost Factor

The default cost for 1-ply core panel is the product of the following:

  • 1-ply core panel cost per mass: specified under Unit Cost in the material stocks table for a 1-ply core with the thickness of the current copper layer; see Layer GCD—and the thickness of the core insulator beneath the current copper layer; see Core Insulator Thickness.

  • Panel mass: product of the following:

    • Panel area: product of the panel length and width; see PCB Panel Size.

    • Panel thickness: specified under Overall Thickness in the material stocks table for a 1-ply core with the thickness of the current copper layer; see Layer GCD—and the thickness of the core insulator beneath the current copper layer; see Core Insulator Thickness.

    • Panel density: specified under Combined Density in the material stocks table for a 1-ply core with the thickness of the current copper layer; see Layer GCD—and the thickness of the core insulator beneath the current copper layer; see Core Insulator Thickness.

Scrap Cost = Layer Processing Scrap Cost +
Non Layer Processing Scrap Cost

Scrap cost is the sum of the following:

  • Layer processing scrap cost: cost of material scrapped during all layer processing cycles. This is the sum across cycles of cycle scrap cost (see formula). When a stack is scrapped during a given cycle, only the cost of material comprising the stack in that cycle counts towards scrap cost. The cost model assumes re-use of not-yet-added material that was slated for later use in the scrapped stack.

  • Non layer processing scrap cost: cost of material scrapped during all processes that do not occur within a layer processing cycle. See formula.

Cycle Scrap Cost = (Cycle Layer Material Cost /
Final Yield) – Layer Material Cost

Cost of material scrapped during a given occurrence of Layer Processing Cycle. Cycle scrap cost depends on the following:

  • Cycle layer material cost: cost of the materials comprising the stack in the given cycle.

  • Final Yield for the given occurrence of Layer Processing Cycle.

Non Layer Processing Scrap Cost =
((Total Layer Material Cost / Final Yield) –
Total Layer Material Cost) – Layer Processing Scrap Cost

Cost of material scrapped during a process that does not occur within a layer processing cycle. Non-layer processing scrap cost depends on the following:

  • Total layer material cost: sum of the material costs accounted for by all the Layer Material operations.

  • Final Yield for the Material Stock process.

  • Layer processing scrap cost: cost of material scrapped during all layer processing cycles. This is the sum across cycles of cycle scrap cost (see formula).