Other Direct Costs

Additional Direct Costs = Colorant Cost * Part Rough Mass / Final Yield

Additional direct costs are the product of the following:

Amortized Batch Setup = Startup Scrap Cost Per Part +
(Setup Time per Batch *
(Labor Rate + Direct Overhead Rate)) / Batch Size

Amortized batch setup, setup cost per part, depends on the following:

  • Startup scrap cost per part (see formula below)

  • Setup time per batch (specified by a machine property)

  • Labor rate: this is the product of the following:

    • Machine property Labor Rate
    • Cost model variable laborRateAdjustmentFactor (1 in starting point Digital Factories)
    • Machine property Work Center Labor Rate Factor (1 in starting point Digital Factories)
  • Direct overhead rate (see Direct and Indirect Overhead)

  • Batch size (specified in the Production Scenario screen of the Cost Guide)

Startup Scrap Cost Per Part =
(Sum of Per Part Material, Labor, and Overhead Cost) *
Number of Scrap Parts

Startup scrap cost per part is a function of the following:

Number of Scrap Parts = Default Scrap Time / Cycle Time

Number of scrap parts is the quotient of the following:

  • Default scrap time (specified in a cost model variable, scrapTimeInMinutes_IM)

  • Cycle time (see Times below)

Total Production Volume = Part Annual Volume * Part Production Life

Total production volume is the product of the following:

  • Part annual volume (specified in the Production Info dialog)

  • Part production life volume (specified in the Production Info dialog)