Changing material utilization

The Material Utilization panel shows the selected utilization mode. Material utilization can be computed or can be entered different ways to drive starting material mass and cost.

Changing material utilization

  1. In the Manufacturing Process pane, click the Material button Material Selection window.

  2. Click the button in the Material Utilization panel

  3. Select the material utilization mode:
    • Computed: aPriori computes utilization with a defined algorithm. The algorithm used varies by process group; more in the aPriori Cost Model Guide.
    • Machine Default: aPriori uses the selected machine’s default utilization value.

    • Override: Specify the material utilization value in the % field. If you selected Override, enter the value in the % field.

  4. Click Ok to apply changes, recalculate the cost, and close the Material Selection window; or click Apply to apply changes and recalculate the cost without leaving the Material Selection window.