Issues Resolved¶
This issue is resolved in aP Workspace 1.4.0.
- Auto Message Generation after Re-costing a Scenario – Previously, a message would be auto-generated for message threads attached to a GCD when a scenario was re-cost in aP Design or aP Pro. This issue has been resolved and so now the auto-generated message is generated only in cases where a GCD is removed from the CAD model, which is the intended behavior.