Regional Data Libraries

aPriori Regional Data Libraries include region specific economic data for multiple regions of the world that is updated semi-annually.

aPriori Regional Data Libraries can be leveraged in customer Digital Factories by inheriting the relevant data, ensuring that semi-annual updates are easily integrated into customer Digital Factories. The manufacturing data is a representation of typical manufacturing practices and costs in that region to support the generation of benchmark cost estimates. Typical applications of benchmark estimates include:

  • Fact-based supplier negotiation
  • Benchmarking supplier quotes
  • Assessing cost impact of sources components or tooling to various or new regions
  • Developing early budgetary estimates and tracking to targets
  • Estimating engineering change orders (ECOs) and design alternatives
aPriori Professional Documentation
aPriori Professional User Guide
aPriori Professional
Value Proposition
Democratization of Cost
How aPriori Professional works
System Requirements
Installation and Uninstallation
Getting Started
Starting aPriori Professional
Start an aPriori Professional on-premise session
Start an aPriori Professional on-premise session
Start an aPriori Professional on-premise session
Start an aPriori Professional on-premise session
Start an aPriori Professional on-premise session
Start an aPriori Professional cloud session
Setting a display language
Getting help
Help Menu
Supported Languages for aPriori Professional online Help
Set the online Help documentation language
aPriori Professional interfaces
Exiting aPriori Professional
Start an aPriori Professional on-premise session
The aPriori Professional Environment
aPriori Professional Ticker
Starting the aPriori Professional Ticker
Costing a component in the aPriori Professional Ticker
aPriori Professional Ticker icons and command buttons
Expanding and Contracting the Ticker
Expand the Ticker
Contact the Ticker
Switching from the Ticker to full view
Full-view aPriori Professional interface
Cost Guide
Component scenario tab
Message pane
Navigation pane
User Preferences
Start aPriori with CAD application
One Click Costing™
Cache New Digital Factories on Startup
Default Scenario Name
Use Official Scenarios in New Assemblies
Multi-Body Options
Viewer
Changing the graphics driver used by aPriori
Managing Unit System Settings
Arranging the full-view interface
Using the Search tool
aPriori Professional icons and command buttons
Status messages
Cost Status Icons
Table controls
Component scenario tabs
Component Viewer
Cost outputs
Manufacturing process
Geometric cost drivers
Component viewer tools and commands
Displaying part characteristics
Copying the component image to the clipboard
Virtual welds
Part setups for machining
Turning axes
Defining draw direction
Working with the Heat Map (Geometry Analysis)
Using component viewer commands
Specifying 2D Images for virtual components
Controlling the resolution of the Component Viewer
Controlling the colors of the Component Viewer
Using the Cost Object Info window
Production Info tab
Administrative Info Tab
Quoted Cost Tab
Purchased parts
Subsequent costing
Using the Cost menu
Cancelling a costing operation
More about costing
Collaboration and Usability
aPriori Components and Scenarios
Naming rules for Components and Scenarios
Opening a component in aPriori Professional
Opening a component from a CAD file or system
Opening a component from the aPriori database
Initial costing: the Cost Guide
Production Scenario: Tab Basic options
Production Scenario Tab: Attributes
Production Scenario Tab: Targets
GCD Tolerances tab
Process and Machine Options Tab
Costing activities at different stages
Creating new components without CAD
Comparing costs of alternative designs
Creating and editing comparison summary views
Comparing large assemblies or roll-ups by using BOM reports
Working with non-CAD-based assembly components
Working with scenarios
Using the Scenario Menu
Creating and editing scenarios and snapshots
Saving a scenario
Working with initial scenarios
Working with official scenarios
Locking and unlocking scenarios
Locking the scenario of a part or assembly
Refreshing the current scenario
Identifying types of scenarios
Deleting a scenario
Switching Scenarios in Assembly/Roll-up Details view
Assembly Scenarios with Missing Sub-Component Scenarios
Saving cost information
Costing using CAD properties
Reconcile Inputs
Copying cost settings
Bulk editing components
Changing the file associated with a component
Automatic geometry updates
CAD independent mode
File-connected mode and file-disconnected mode
CAD independent mode
CAD independent mode
Direct integration mode
Active and Inactive scenarios
Make a scenario Active or Inactive
Working in Direct Integration mode
Closing a component
Switching to the Ticker
Operational Databases
Database Connections
Refreshing the database connection
Monitoring Database Connection Speed
Importing and exporting data
Functional overview
Basic workflow for sharing data
Data Integrity: Import existing parts in Database
Roll-ups, Dynamic Roll-ups, and Functional Groups
Roll-ups
Creating and editing roll-ups
Cutting, copying, and pasting between roll-ups
Dynamic roll-ups
Functional groups
Reapplying functional groups templates
Functional group naming conventions
Best practices for using functional groups
Sustainability Insights
Sustainability scope
Processes supported in Sustainability
Examine, Compare, and Reduce CO2e
Review the Carbon Summary for a part
Sustainability spreadsheet reports
See annual amount of carbon in a part or product based on volume
See how much energy is consumed per part
See how different manufacturing options affect carbon impact for a part
Identify manufacturing location with lowest carbon and lowest cost
Check if a part has less carbon impact than an earlier version
See carbon impact of using recycled material
See carbon impact of using renewable energy at a manufacturing facility
Identify carbon outliers
Reduce material CO2e for a part
Editing Sustainability data
Edit Sustainability data in the Part Details tab
Edit Sustainability data in Digital Factory Manager
Edit the Logistics Carbon for a part
Calculate the Electricity Carbon Factor for a Digital Factory
See how the carbon for a part is calculated
Sustainability tab
CO2e units
Sustainability License
Access Control
How access control works
Groups, Permissions and Resources
Groups
Permissions
Resources
Access Control principles
Access control rules
How Access Control impacts search results
Digital Factory Access Control Requirements
Costing
Deep Costing and Costing All Scenarios
Material Catalog
Overlay Digital Factories
Digital Factory Manager
Viewing a Costed Component
Understanding Access Control issues
Manufacturing Process Information
Manufacturing process routing tree/table
Manufacturing process commands
Selecting a primary process group
Material selection
Change material catalog
Change selection policy
Selecting material
Changing material stock
Changing material purchase volume
Changing material unit cost
Changing material utilization
Editing production, administrative, or quote information
Specifying or importing tolerance and roughness values
How tolerances map to GCDs
How aPriori calculates achievable tolerance ranges
How aPriori determining cycle time adjustment factors
Using the Tolerance Policy Editor
Manually editing specific tolerances
Importing PMI from CAD
PMI differences across CAD applications
Editing yields
Good Part Yield and Final Yield
Viewing and setting Good Part Yield values
Calculations related to yield
Selecting a Digital Factory
Selecting a machine for an operation
Editing process setup options
Selecting a process routing
Viewing options
Understanding the legend
Expandable nodes
Selecting and editing a routing
Selecting alternative processes
Reverting to aPriori auto-selected routing
Using the right-click menu
Selecting an unfeasible machine for a process
Using the auto-select parent process command
No Cost Feature
Creating custom routings
Create a custom routing
Creating a custom operation sequence
Creating custom processes
Assigning operations to different processes
Specifying simultaneous operations
Geometric Cost Drivers
Overview
Working with large parts
Displaying GCDs
Geometric cost drivers tree/table
Editing values in the GCD properties table
Costing a component after editing GCD properties
GCD commands
GCD operation sequence selection
Unsupported GCD Messages
Operation sequence table
Viewing options
Understanding the legend
Expandable nodes
Selecting and editing an operation sequence
Selecting alternative operations
Using the right-click menu
GCD properties
GCD categories
Component GCDs
Base Properties
Blank
Main Surface
Parting Line
Subcomponents
Volume GCDs
Stock Trims
Bulk Removals
Pockets
Rings
Void
ComboVoid
AxiGrooves
Heligroove (Helical Groove)
SlideBundles
LifterBundles
Bending/forming GCDs
Bends
Multiple Bends
Forms
Lances
ShearForms
Ends
Holes GCDs
Simple Holes
Multi Step Holes
Ringed Holes
Surfaces GCDs
Planar Faces
Curved Walls
Curved Surfaces
Sharp Edge
Weld GCDs
2-Model Machining GCDs
GCD relations
Ends On
Intersects
Lies Near
Lies Outside
Parallel
Costing Output Tables
Overview of the cost tables
Part Summary tab
Component Information
Production Information
Material Information
Cost by Category (%)
Cost by Processes (%)
Component Costs and Targets
Validation and Design Guidance
Prerequisites
Workflow: Validation and Design Guidance
Validation and Design Guidance Example
Working with Validation and Design Guidance
Cost Summary
Excluding investment costs from fully burdened costs
Part Details and Assembly Details
Investment
Assembly tracker
Assembly process detail
Create a new view
Changing decimal place settings
Overriding computed values
Cost Overrides and One Click Costing
Part Details overrides
Show Formula Dependencies
Cost Summary overrides
Total cost summary overrides
Precedence of production input overrides
Cost overrides summary dialog
Bulk Costing and Analysis
Overview
User input files
Process Setup Option columns
CSL Formula Override columns (non-custom processes only)
Custom (defined) Attribute columns
Pinned Routings
Specify different datatypes in CSV files
Material Modes
Bulk costing groups of parts
Bulk costing part scenarios and assemblies
Deep costing assemblies
Costing multi-body parts (free bodies)
Bulk Costing 2-Model Machining Parts
Bulk costing data fields
Scenario support fields
Bulk costing required attributes
Creating scenarios through Bulk Costing
Editing bulk costing inputs
Bulk Costing Menu Reference
Costing a bulk cost group
Costing with CAD properties
Costing without a CAD file
Associating an image without a CAD file
Cost Overrides
Bulk costing and analysis results
Running from the Command Line
bulkLoad.cmd
Syntax
Arguments
Example
Forward and back slashes
bulkLoad.properties file
plugin.properties file
Running as a Scheduled Task
Bulk Costing Usage Reports
Cost failures during bulk costing
Improving performance
Matrix Costing
Use Matrix Costing
Scenario naming convention for Matrix Costing
Matrix Costing Cleanup
Limitations for Matrix Costing
Spreadsheet Reports
Excel and Google Sheets Compatibility
When to use spreadsheet reports
System-Defined Spreadsheet Reports
Sustainability spreadsheet reports
Custom Spreadsheet Reports
File types
Workflow: Custom reports
Creating a Custom Spreadsheet Report
Creating a Custom spreadsheet report
Editing XML Files
Complexity
To Generate XML or CSV Files
Elements of Report Files
Basic Structure of the XML File
The <reports> Tag
The <CostModelWatchPoints> Tag
The <node> Tag
The <CSL> Tag
The <Formula> and <Macro> Tags
Commonly Used Variables
Built-in Aggregation, Quoted Cost and other
User Defined Attributes
Using the <Macro> Tag
Variables for use
Part images and nesting diagrams in a report
Including information about scenario overrides
PivotTables
When to use PivotTables
Installing and Running Custom Reports
From the GUI
By Copying
Caveats
Defining a shared store
Running from the Command Line
runAprioriReport.cmd
Troubleshooting FAQ
XML Configuration File Reference
Column Headings
<reports>
<CostModelWatchpoints>
<node>
<OperationNodes>
<CSL>
<Formula>
<MACRO>
<GcdTypes>
<Gcd>
<Attribute>
glossary
System Administration
Guide Overview
System Administration Overview
System Administraton
Managing LDAP server connections
LDAP Connections and Access Control Groups
LDAP authentication
LDAP connection behavior
Defining an LDAP connection
Filtering imported users
Configuring an LDAP SSL connection
Managing users
Adding users
Editing User Information
Resetting passwords
Removing users
Reactivating a user
Managing Single sign-on (SSO) options
Single sign-on debugging
Single sign-on and aPriori Command Line Utilities
Managing license module
Managing deployments
Recommended deployment architecture
Data Stored in the aPriori database
aPriori Licensing
Remote User Teams
Granting Permissions to Deployments and Access Control
Managing deployments as a system administrator
Editing deployment settings
Editing user settings
Using schema privileges and schema fields
Managing groups
Managing user defined attributes
UDAs in the user interface
UDAs that override site variables
Exporting and importing custom attributes
Understanding dependent UDAs
Dependency context details
Managing the Official Scenario default policy
Managing dialog views
Controlling searchable fields in the Search tool
Customizing fields on the Cost Guide
Customizing fields on the Cost Guide
Managing System Variables for Session Timeout
Managing System Variables for User Lockout
Managing system variables: Search
Managing systems variables: Other
Managing unit system settings
Access Control
Introduction to Access Control
Access Control basic concepts
Resources
Access Control basic concepts
Permissions
A note about terminology
Import and export
Importing guidelines
Best practices
Using import and export for Access Control
Guidelines and principles for access control
Access control principles
Guidelines to rules
Use case example
Region-Based
Extending the Example
Access Control user interface
Groups tab
Permissions tab
Access Control command line
Managing groups using Access Control from the command line
Group load command syntax
Group management spreadsheet template
Import Results and Error Messages
Managing user-group associations
Enabling Cost Insight Admin scenario export privileges
Access Control of Access Control
Basic rules for Access Control of Access Control
Example configuration
Configuring admin roles with Access Control
Create permission to access System Admin Toolset
Associate a permission to a group
Create permission to access Digital Factory Admin Toolset
Granting permissions selectively
Multi-generational Access Control permission interactions
aPriori Professional Out-of-box Access Control Model
Access Control for Cost Insight Connect Workflows
Access Requirements for APrioriCIGenerateUser Accounts
License Requirements for aPrioriCIGenerateUser Accounts
Component Schema Access Requirements for APrioriCIGenerateUser Accounts
Configuring the Geometry Analysis Tool (Heat Map)
Heat map overview
Heat Map configuration basics
Heat map basic edit example
Configuring a favorites section
Suppressing a heat map menu item
Controlling the X-axis display
Heat map localization
Configuring the Wire Harness and PCBA Process Groups
Wire Harness and PCBA Process Groups
Importing or adding UDAs
Adding costing macros
Mapping CAD Properties
Overview of CAD property mapping
Supported CAD systems and neutral file formats
Draw direction mappings
Production input mappings
Description
Material
Note about PLM mappings
UDA mappings
Mapping UDAs that have default values
General rules for mapping CAD properties
Multiple Mappings and Precedence
Overriding Mapped Values
Elements of an XML CAD mapping file
CAD Mapping tag reference
Importing a CAD property mapping file
Exporting a CAD property mapping file
Clearing your mappings
CAD properties mapping examples
Examining CAD file for properties to be mapped
Adding UDAs to aPriori
Creating an XML mapping file
Using CSL logic in your mappings
Basic examples of CSL logic
Advanced CSL logic examples
Troubleshooting
Adjusting Heap Memory
Types of memory
Reasons for increasing heap
Types of aPriori heap
Adjusting aPriori heap size
Standalone aPriori: start-up file
Standalone aPriori: environment variable
Creo® Direct Integration: start-up file
Creo® Direct Integration: environment variable
Properties Files
Overview of properties files
aPriori properties file
Enable surface model properties
aPriori user properties file
Controlling component color using properties
Bulk Load properties file
Plugin properties file
Other properties files
Migration Import Tool
Migrating or importing ACM from a pre-2019 R2 Release
Scenario Synchronization (deprecated version)
Digital Factory Administration Guide
Digital Factory Administration Overview
Introduction to Digital Factories and administration
The Digital Factory Toolset
Using the Search CSL utility
Digital Factory Manager
Overview of the Digital Factory Manager
Managing Digital Factories
Opening a Digital Factory
Changing currency and exchange rate version
Creating a new Digital Factory
Making a standalone copy of a Digital Factory
Working with overlay (Inherited) Digital Factories
Creating an overlay Digital Factory
Overlay configuration example
Determining if a Digital Factory is an overlay
Digital Factory export operations
Exporting a single Digital Factory
Exporting multiple Digital Factories
Exporting processes
Exporting Digital Factory Data to Excel
Exporting Digital Factory Lookup tables to Excel
Export from the command line
Digital Factory import operations
Importing a single Digital Factory
Importing multiple Digital Factories
Importing processes
Importing Digital Factory Data from Excel
Importing Digital Factory lookup tables from Excel
Importing from the command line
Importing a starting point Digital Factory update
Deleting a Digital Factory
Viewing a Digital Factory change log
Editing Digital Factories
Adding machine and material data
Adding a machine
Adding a custom material
Working with linked materials
Unlinking material fields
Linking and unlinking materials
Deleting source materials
Using generic source materials
Using cost adjustment factors for linked materials
Adding a material stock
Adding a tool shop
Creating a new process for process group
Exporting, modifying, and importing processes
Editing Digital Factory data
Deleting machine and material data
Removing tool shops from a Digital Factory
Configuring Validation Display Controls
Working with Material Factors
Material factors table
How Material Factors table is used during costing
Editing the material factors table
Working with wage grades
Managing skill levels
Managing wage grades
Managing wage grade associations
Managing Digital Factory cut code data
Assigning material cut codes
Adding user-defined cut codes
Process Group Site Variables
Overview of Process Group Site Variables
Site Variables
Site variable procedures
Scenario-specific site variable overrides
Deployment Data Administration
Overview of the Deployment Data admin tool
Selecting your deployment site
Currencies in aPriori
Displaying currency data
Selecting the currencies to display
Managing currency data
Saving an exchange rate version
Managing process groups
Managing cost taxonomy display names
Managing default purchase volumes
BOM Loader
Working with BOMs and catalog parts
Starting the BOM loader
BOM loading
Loading a BOM
Formatting a BOM
Mapping BOM loader headings
BOM loader assumptions
BOM loader from the command line
Using the bomLoad command
Wire Harness and PCBA Digital Factories
Managing Wire Harness and PCBA Digital Factories
Adding or importing UDAs
Importing the Wire Harness and/or PCBA Digital Factory
Mapping BOM Loader headings
Creating Wire Harness XML tables
Compiling Component Library data
Your company provides or compiles the data
Using a third-party to compile the data
Updating the Component Library
Updating the Component Library lookup tables
Exporting the Component Library lookup tables
Maintaining the Component Library
Cost Model Workbench User Guide
Cost Model WorkBench
Getting Started with the Cost Model Workbench
Starting and Exiting the CMWB
Components of the CMWB Interface
Working with Cost Models
Working with Cost Model Data and Metadata
Working with Cost Model Logic
Working with Cost Model Data and Metadata
Navigating to Global Data
Navigating to Data for a Process, Operation or Branch Node
Working with Plant Variables
Viewing and Modifying Digital Factory Variables
Creating and Deleting New Plant Variables
Working with Lookup Tables
Navigating to Lookup Tables
Viewing and Modifying Lookup Tables
Viewing and Modifying Lookup Table Definitions
Creating or Deleting Lookup Table Definitions
Adding New Lookup Tables
Removing Lookup Tables
Working with Machine Metadata
Viewing and Modifying Machine Types
Adding and Deleting Machine Types
Adding or Modifying a Machine Field
Working with Material Metadata
Viewing and Modifying Material Types
Working with Material Stock Metadata
Viewing and Modifying Material Stock Types
Working with Tool Shop Metadata
Viewing and Modifying Tool Shop Types
Adding or Deleting Tool Shop Types
Associating a Tool Shop Type with a Process
Removing a Tool Shop Type from a Process
Working with Tool Material Metadata
Viewing and Modifying Tool Material Types
Adding or Deleting Tool Material Types
Working with Process Setup Options
Navigating to Process Setup Options
About Process Setup Options
Modifying Process Setup Options
Adding and Deleting Process Setup Options
Including and Excluding GCD Types
Working with Column Groups and Properties
Working with Node Attributes
Adding, Removing, and Modifying Node Attributes
Predefined Node Attributes
Working with Cost Model Logic
CSL Language Overview
Formulas
Rules
Advice Rules
Imports
Expressions in CSL
Values
Line Continuation
Comments in CSL
Searching Within and Across CSL Modules
Using the CSL Debugger
Viewing and Editing CSL Modules
Navigating to the CSL Modules for a Given Node
Viewing CSL Modules
Editing CSL Modules
Adding CSL Modules
Deleting CSL Modules
Creating and Deleting Processes, Operations, and Branch Nodes
Creating and Copying Processes
Creating and Copying Operations
Creating Branch Nodes
Deleting Processes, Operations, and Branch Nodes
Working with Formula Tables
Adding a Formula to the Formula Table
Template Pruning
Material Stock Selection
Process and Operation Optionality
Process and Operation Feasibility
Machine Selection
Tool Selection
Process and Operation Taxonomy
Working with Zero-or-More Nodes
Working with Templates
About Templates
Viewing and Editing Templates
Cost Engine Details
Hierarchies
Algorithm Overview
Process Template Expansion and Pruning
Material Stock Selection
Feasibility and Machine Selection
Operation Assignment
Operation Costing
Process Costing
Cost Scripting Language Reference
Overview
Module Types
Module Contents
Values and Expressions
Modules, Inputs, and Outputs
Syntax
Inputs
Outputs
Imports
Formulas and Rules
Formulas
Set Blocks
Rules
Messages
Advice Rules
Advice
Function Definitions
Expressions
Arithmetic Expressions
String Expressions
Boolean Expressions
Conditional Expressions
Function Invocations
Query Expressions
Foreach Expressions
Like Expressions
Identifiers and Literals
Comments and Line Continuation
Predefined Functions
Numeric Functions
String Functions
List Functions
Map Functions
Node Attribute Functions
Routing Navigation Functions
Error Handling Functions
Interpolation Function
Miscellaneous Functions
Common Task Examples
Adding a New Process to a Process Group
Copying the Process
Renaming the Operations
Adding Operations
Adding New Processes and Operations to Templates
Modifying the Process-level Routings
Modifying the Operation-level Routings
Defining and Modifying Machine Types
Defining a Machine Type for a New Process
Modifying a Machine Type: Padding Cycle Time
Modifying a Machine Type: Class of Machines
Modifying Machine Selection
Preferring One Class of Machines Over Another
Adding Feasibility Rules
Adding New Plant Variables
Adding New Process Setup Options
Adding a Setup Option: Using List Mode to Access a Lookup Table
Adding a Setup Option: Padding Cycle Time
Adding Lookup Tables
Adding a Lookup Table
Modifying Taxonomy Modules
Modifying the Cycle Time Formulas
Padding Cycle Time by Adding a Constant
Adding and Modifying Library Modules
Cost Model Guide
Cost Model Guide Overview
Introduction
Direct and Indirect Overhead
Overview
Digital Factory Variables, Machine Properties, and Overhead Costs
Displaying and Overriding Overhead Values
Overhead Costs per PartOverhead Costs per Part
Overhead Rates
Annual Direct Overhead
Annual Depreciation
Annual Maintenance
Energy to Run Machine
Annual Supplies
Imputed Interest
Annual Indirect Overhead
Facilities Cost
Support Services Cost
Overhead Formula Reference
Root and Site Cost Model Formulas
Fully Burdened Cost
Piece Cost
Other Direct Costs
Amortized Investment
Sustainability Overview
2-Model Machining Process Group
Cost Model Overview
2-Model Quick Start
Benefits of 2-Model Machining
Sustainability Data for 2-Model Machining
Part alignment
A 2-Model Machining example
Cost the input source model
Cost the finished model
Transitioning to 2-Model
2-Model GCDs
Source model GCD
Flat GCD
GCD property “Is Stock Surface”
Additive Manufacturing
Process Routing for Additive Manufacturing
Materials for Additive Manufacturing
Process Feasibility for Additive Manufacturing
Machine Selection for Additive Manufacturing
Machine Feasibility for Printing
Machine Feasibility for Laser Sintering
Machine Feasibility for Metal Sintering
Machine Feasibility for Resin Curing
Machine Feasibility for Part Curing
Draw Direction for Additive Manufacturing
Additive Manufacturing Formulas
Accounting Formulas for Additive Manufacturing
Yield Formulas for Additive Manufacturing
Printing Formulas
Laser Sintering Formulas
Metal Sintering Formulas
Resin Curing Formulas
Breakoff Formulas
Power Tool Base Removal Formulas
Cleaning Formulas
Part Curing Formulas
Sieving Formulas
Powder Loading Formulas
User Inputs for Additive Manufacturing
Using the Build Direction Tool to Orient the Part
Top-level Setup Option
Printing Setup Options
Laser Sintering Options
Metal Sintering Options
Resin Curing Options
Part Curing Option
Sieving Option
Powder Loading Option
Assembly
Cost Model Overview
General Process
Part Geometry
Contact Regions and Contact Groups
Materials
Machines
Tooling
Feasibility and Routing
Adhesive Bonding Routing
Lock Bolt Routing
Threaded Insert Routing
Sealing Routings
Rivet Process Routing
Pick and Place Routing
Mechanical Assembly Routing
Welding Routing
Welding Operation Feasibility
Weld Prep Operation Feasibility
Material Selection
Machine Selection
Cost Algorithms and Calculations
Yields
Adhesive Bonding Formulas
Lock Bolt Formulas
Threaded Insert Formulas
Cap Sealing Formulas
Fay Sealing Formulas
Fillet Sealing Formulas
Rivet Process Formulas
Manual MIG Welding and Robotic MIG Welding
Volume and Cross-sectional Area for Virtual Welds
Manual TIG Welding and Robotic TIG Welding
Manual Spot Welding and Robotic Spot Welding
Electron Beam Welding Formulas
Laser Welding Formulas
Pick and Place Formulas
Weld Prep Calculations
Weld Clean Up Calculations
Mechanical Assembly Calculations
User Inputs
Adhesive Bonding Process-level Options
Adhesive Bonding Operation-level Options
Lock Bolt Options
Threaded Insert Options
Cap Sealing Options
Fay Sealing Process-level Options
Fay Sealing Operation-level Options
Fillet Sealing Options
Rivet Process Options
Pick and Place Options
Robotic MIG Welding Process-level Options
Manual MIG Welding Process-level Options
Assembly Manual MIG Welding Number of Reorientations
MIG Welding GCD-level Options
Robotic TIG Welding Process-level Options
Manual TIG Welding Option
TIG Welding GCD-level Options
Robotic Spot Welding Options
Manual Spot Welding Options
Assembly Manual Spot Welding Total Number of Spot Welds
Electron Beam Welding Options
Laser Welding Options
Ultrasonic Welding Process-level Options
Ultrasonic Welding Subcomponent-level Options
Mechanical Assembly Options
Process Defaults and Thresholds
Assembly Welds
Pro Welds
Virtual Welds
Assembly Views
The Assembly Details Tab
Assembly Details Context Menu
Configurable Views
The Assembly Tracker Tab
Assembly Machining
Assembly Molding Process Group
Cost Model Overview for Assembly Molding
Processes for Assembly Molding
Part Geometry for Assembly Molding
Materials for Assembly Molding
Machines for Assembly Molding
Tooling for Assembly Molding
Assumptions and Limitations for Assembly Molding
Geometric Cost Drivers for Assembly Molding
Routing and Feasibility for Assembly Molding
Process Routing for Assembly Molding
Process Feasibility for Insert Injection Molding
Operation Assignment for Insert Pick and Place
Operation Assignment for Insert Injection Molding
Machine Selection for Assembly Molding
Machine Selection for Insert Pick and Place
Machine Selection for Insert Injection Molding
Formulas for Assembly Molding
Insert Pick and Place Process Formulas
Insert Pick and Place Operation Formulas
Insert Injection Molding Formulas
Runner Volume, and Area for Assembly Molding
Yields for Assembly Molding
User Inputs for Assembly Molding
Top-Level Setup Options
Process-level Insert Pick and Place Options
Operation-level Insert Pick and Place Options
Insert Injection Molding Options
Assembly Plastic Molding Process Group
Cost Model Overview for Assembly Plastic Molding
Processes for Assembly Plastic Molding
Part Geometry for Assembly Plastic Molding
Materials for Assembly Plastic Molding
Machines for Assembly Plastic Molding
Tooling for Assembly Plastic Molding
Geometric Cost Drivers for Assembly Plastic Molding
Using the Component Staging and Materials Dialog
Changing a Subcomponent’s Component Type
Separating, Combining, and Moving Components
Using the Component Structure Tab
Routing and Feasibility for Assembly Plastic Molding
Process Routing for Assembly Plastic Molding
Process Feasibility for Multi-Shot Molding
Process Feasibility for Pick and Place
Operation Assignment for the Multi-Shot Operation
Operation Assignment for Pick and Place Operations
Machine Selection for Assembly Plastic Molding
Machine Selection for Multi-Shot Molding
Machine Selection for Pick and Place
Required Shot Size
Required Clamp Force
Formulas for Assembly Plastic Molding
Pick and Place Cycle Time and Labor Time
Multi-Shot Molding Cycle Time and Labor Time
Elapsed Time for Multi-Shot Molding and Pick and Place
Material Cost and Utilization for Multi-Shot Molding
Runner Volume and Runner Area for Multi-Shot Molding
Yields for Assembly Plastic Molding
Tooling for Multi-Shot Molding
User Inputs for Assembly Plastic Molding
Top-level Setup Options
Multi-Shot Molding Process Setup Options
Multi-Shot Operation Setup Options
Pick and Place Process Setup Options
Robotic Load GCD-level Option
Manual Load GCD-level Options
Bar & Tube Fabrication
Cost Model Overview
Bar & Tube General Process
Part Geometry
Materials and Stock Forms
Machines
Tooling
Costing Flow
GCD Extraction
Feasibility and Routing
Cost Algorithms and Calculations
Yields for Bar & Tube Fabrication
Material Cost and Utilization
Batch Setup
Band Saw, Circular Saw, Reciprocating Saw
Tube Laser
Punching
Bar Bend Brake
Compression Bending
Rotary Draw Bending
Profile 3 Roll Bending
Profile CNC Bend
Forming
Laser Cut, Oxy Fuel Cut, Plasma Cut
Shear
Roll Bending (2-, 3-, and 4-roll)
3-Roller Bending (deprecated)
Extrusion
Billet Preheat
Die Preheat
User Inputs
Bar & Tube Fabrication Node Options
Other Setup Options
Extrusion Setup Options
Profile 3 Roll Bend Options
Profile CNC Bend Options
Process Group Site Variables
Tube Recognition
Extrusion Recognition
Process Defaults and Thresholds
Material Utilization
Band Saw, Circular Saw, Reciprocating Saw
Tube Laser
Punching
Roll Bending
Design Guidance Configuration for Bar and Tube Fabrication
Casting - Die
Die Casting Cost Model Overview
Die Casting General Process
Part Geometry for Die Casting
Materials for Die Casting
Machines for Die Casting
Tooling for Die Casting
GCD Extraction for Die Casting
Slide Bundles for Die casting
Manufacturability
Turning Axes for Die Casting
Draw Direction for Die Casting
Feasibility and Routing for Die Casting
Die Casting Process-level Routing
High Pressure Die Casting Operation-level Feasibility
Gravity Die Casting Operation-level Feasibility
Material Selection for Die Casting
Machine Feasibility and Selection for Die Casting
Cost Algorithms and Calculations for Die Casting
Yields For Die Casting
Material Cost and Utilization for Die Casting
Labor and Setup Costs for Die Casting
Gating System Model for Die Casting
Melting Formulas for Die Casting
Cleaning Formulas for Die Casting
Finishing Formulas for Die Casting
Visual Inspection Formulas for Die Casting
Design Complexity Factor
High Pressure Die Casting and Gravity Die Casting Process Formulas
Trim Formulas for Die Casting
Core Refractory Coating for Die Casting
Refractory Coat Oven Dry for Die Casting
Refractory Coat Air Dry for Die Casting
Required Clamp Force
Coremaking for Die Casting
Number of Mold Cavities for Die Casting
Tooling Cost for Die Casting
User Inputs for Die Casting
Casting - Die Node Inputs
Melting Process Inputs
High Pressure and Gravity Die Casting Process Inputs
Trim Process Inputs
Refractory Coating Process Inputs for Die Casting
Finishing Process Input
Sustainability Data for Die Casting
Design Guidance Configuration for Die Casting
Material Issues: Wall Thickness Thresholds
Draft Issues: Draft Angle Thresholds
Radius Issues: Edge Radius Thresholds
Proximity Issues: Hole Proximity Issues
Hole Issues: Maximum Hole Depth
Hole Issues: Minimum Hole Diameter
Tolerance Grade and Roughness Ranges
Casting - Investment
Investment Casting Overview
Processes
Tooling
Part Geometry
Manufacturability for Investment Casting
Turning Axes for Investment Casting
Materials
Investment Casting Feasibility and Machine Selection
Investment Casting Feasibility
Investment Casting Machine Selection
Tree Box Dimensions
Number of Parts per Tree
Slide Bundling Criteria
Investment Casting Cost Algorithms and Calculations
Overhead Calculations for Investment Casting
Setup Cost for Investment Casting
Yields for Investment Casting
Band Saw Formulas
Belt Sand Formulas
Bench Operation Process Formulas
Ceramic Core Firing Formulas
Ceramic Core Making Formulas
Ceramic Core Mass
Ceramic Leaching Formulas
Cooling Formulas for Investment Casting
Drying Formulas
Knockout Formulas
Metal Pouring Formulas
Mold Burnout Formulas
Mold Preheating Formulas
Primary Sand Coating Formulas
Primary Slurry Dipping Formulas
Robotic Assist Formulas
Secondary Sand Coating Formulas
Secondary Slurry Dipping Formulas
Soluble Wax Core Making Formulas
Soluble Wax Leaching Formulas
Soluble Wax Core Mass
Steam Autoclave Dewaxing Formulas
Wax Pattern Molding Formulas
Tree Weight
Tree Wax Weight
Gating Efficiency
Core Tooling Groups
Setup Options for Investment Casting
Top-level Setup Options for Investment Casting
Ceramic Coring Options
Soluble Wax Coring Options
Core Finish Options
Wax Pattern Molding Options
Pattern Sub-Assembly Option
Shell Making Options
Flash Fire De-Waxing Options
Mold Burnout Options
Steam Autoclave De-Waxing Options
Mold Cleaning Option
Visual Inspecting Options
Insulation Wrapping Option
Mold Preheating Options
Cooling Option
Cleaning Options
Finishing Option
Dimensional Inspecting Options
Casting - Sand
Sand Casting Cost Model Overview
Sand Casting General Process
Part Geometry for Sand Casting
Materials for Sand Casting
Machines for Sand Casting
Tooling for Sand Casting
GCD Extraction for Sand Casting
Manufacturability
Turning Axes for Sand Casting
How aPriori Chooses Draw Direction for Sand Casting
Feasibility and Routing for Sand Casting
Sand Casting Process-level Routing
Sand Casting Process-level Feasibility
Coremaking Feasibility and Routing for Sand Casting
Sand Casting Operation-level Feasibility
Material Selection for Sand Casting
Machine Feasibility and Selection for Sand Casting
Cost Algorithms and Calculations for Sand Casting
Yields for Sand Casting
Material Cost and Utilization for Sand Casting
Labor and Setup Costs for Sand Casting
Melting Formulas for Sand Casting
Melting Formulas for Sand Casting
Cleaning Formulas
Finishing Formulas
Visual Inspection Formulas
Cope Height
Design Complexity Factor
Gating System Model
Mold Making Formulas
Coremaking—All Except Stock Core
Coremaking: Stock Core
Refractory Coat Mold
Refractory Coat Cores for Sand Casting
Refractory Coat Oven Dry for Sand Casting
Refractory Coat Air Dry for Sand Casting
Pour Formulas
Cool Formulas
Shakeout Formulas
Required Clamp Force
Number of Mold Cavities
Tooling Cost for Sand Casting
User Inputs for Sand Casting
Top-level Sand Casting Setup Options
Melting Setup Options
Coremaking Setup Options
Moldmaking Setup Options
Pour Setup Options
Shakeout Setup Options
Cleaning Setup Options
Refractory Coating Setup Options for Sand Casting
Degating Setup Options
Finishing Setup Options
Visual Inspection Setup Options
Process Defaults and Thresholds for Sand Casting
Customizing the Number of Core Segments
Material Utilization Variable
Design Complexity Variables
Hole Feasibility Variable
Machine Selection Variable
Melting Variable
Moldmaking Variables
Coremaking Variables
Gating System Variables
Refractory Coating Variables
Visual Inspection Variables
Design Guidance Configuration for Sand Casting
Material Issues: Wall Thickness Thresholds
Draft Issues: Draft Angle Thresholds
Radius Issues: Edge Radius Thresholds
Proximity Issues: Hole Proximity Issues
Hole Issues: Maximum Hole Depth
Hole Issues: Minimum Hole Diameter
Tolerance Grade and Roughness Ranges
Composites
Composites Cost Model Overview
Composites General Process
Part Geometry for Composites
Materials for Composites
Machines for Composites
Tooling for Composites
GCD Extraction for Composites
Component GCD
Ply GCD
Core GCD
Finished Part GCD
Ply and Core Metadata
CAD Model Metadata in XML Format
Supplemented CAD Model Metadata in XML Format
Routing and Feasibility for Composites
Machine Selection for Composites
Ultrasonic Cut Machine Selection
Machine Selection for Mold Preparation, Hand Layup, and Bench Operation
Tool Clean Machine Selection
Automated Fiber Placement Machine Selection
Automated Tape Layup Machine Selection
Autoclave Cure Machine Selection
Cost Algorithms and Calculations for Composites
Labor-dependent and Labor-independent Tasks
Labor-dependent and Labor-independent Tasks
Ultrasonic Cut Process
Ultrasonic Cutting Operation
Mold Preparation Process
Applying Mold Release Operation
Applying Mold Release Operation
Applying Tool Tack Operation
Applying Tool Tack Operation
Hand Layup Process
Ply Placing Operation for Hand Layup
Core Potting Operation for Hand Layup
Core Splicing Operation for Hand Layup
Core Placing Operation for Hand Layup
Debulk Component-level Operation
Vacuum Bag Process
Tool Length, Width, and Area
Remove Vacuum Bag Component-level Operation
Final Vacuum Bag Process
Final Vacuum Bag Process
Final Vacuum Bag Process
Automated Tape Layup Process
Ply Placing Operation for Automated Tape Layup
Automated Fiber Placement Process
Ply Placing Operation for Automated Fiber Placement
Ply Deformation Level
Autoclave Cure Process
Bench Operation Process
Inspecting Component-level Operation
Tool Breakdown Component-level Operation
Tool Clean Process
Manual Tool Cleaning Operation
Cryogenic Tool Cleaning Operation
Laser Tool Cleaning Operation
Overhead Calculations for Composites
User Inputs for Composites
Composites Node Option
Ultrasonic Cut Options
Mold Preparation Options
Hand Layup Options
Automated Tape Layup Options
Automated Fiber Placement Options
Autoclave Cure Options
Bench Operation Options
Forging
Forging overview
Closed Die Forging
Closed Die Forging material
Closed Die Forging machines
Closed Die Forging process routings
Closed Die Forging process setup
Closed Die Forging costing details
Ring Rolled Forging
Process Routing for Ring Rolled Forging
Material for Ring Rolled Forging
Part Cross-sections for Ring Rolled Forging
Machine Selection for Ring Rolled Forging
Cost Calculations for Ring Rolled Forging
Setup Options for Ring Rolled Forging
Top-level setup options
Material Stock Setup Option
Heat Treatment
Heat Treatment Overview
Heat Treatment Processes
Heat Treatment Machines
Heat Treatment Process Routings
Heat Treatment Yields
Heat Treatment Process Setup
Hot Isostatic Pressing
Process Routing and Feasibility for Hot Isostatic Pressing
Machine Selection for Hot Isostatic Pressing
Formulas for Hot Isostatic Pressing
Setup Options for Hot Isostatic Pressing
Age Process
Machine Selection for the Age Process
Feasibility and Routing for the Age Process
Formulas for the Age Process
Setup Options for the Age Process
Heat Treatment Costing: Other Processes
Sustainability Data for Heat Treatment
Stock Machining and Machining
Machining Overview
Material Stock and Utilization
Stock Machining Material Composition
Stock Machining Material Stock Type
Material Stock Alignment and Cross-section Determination
Stock Machining Material Stock Sizes and Allowances
Stock Machining and Hex Stock
Stock Machining Material Utilization
Stock Machining Routing and Plate Stock
GCD Extraction
Component GCD
Hole GCD
Parallel Surface Chain GCD
Perimeter GCD
LIES_NEAR Relation
IS_ABOUT Relation
IS_FILLET_OF Relation
CrossSection GCD
Pocket GCD
Slot GCD
Stock Trim GCD
Slot GCD
Routing and Feasibility for Machining
Process Routing and Feasibility for Machining
Machine Selection for Machining
Operation Routing and Feasibility for Machining
Multiple Approach Surface Finishing
Virtual Machining
Tool Selection for Machining
Cost Algorithms and Calculations for Machining
Yields For Machining
Feeds and Speeds in the Machining Cost Model
Operation Cycle Time and Cut Time Calculations
Cut Depth for Roughing Operations
Chemical Milling Formulas
Batch Setup Time
Process Cycle Time
Expendable Tooling Costs
User Inputs for Machining
Machining Node Process Setup Options
Stock Machining Node Process Setup Option
Machining Process-level Options
Surface Finishing Milling Options
Hole Making Options
Hole Rough Milling Options
Rough Turning Options
Finish Turning Options
Edge Finishing Option
Deburring Options
Threading Options
Surface Rough Milling Options
Pocket Rough Milling Options
Perimeter Milling Options
StockTrim Roughing Options
Slot Milling Options
Groove Milling Options
Slot Rough Milling Options
Dovetail Finishing Options
Rotary Broaching Options
Polygon Turning Options
Bulk Milling Options
Profile Milling Options
Keyway Broaching Options
Chemical Milling Options
Setup Operation Options
Material Stock Setup Options
Design Guidance Configuration for Machining
Standard Drilling Tool Diameters
Standard Filleting Tool Diameters
Tolerance Grade and Roughness Ranges
Sustainability Data for Stock Machining
Sustainability Data for Machining
Semi-automated Costing
Semi-automated Costing
Semi-automated Costing
Workflow
Achieving Full Costing
Working with Features to Review
Working with the Heat Map (Geometry Analysis)
Modifying Machining Operation Assignments
Explicitly Assigning Operations to GCDs
Manually Assigned Operations
Working with Gears, Splines, Sprockets, and Flutes
Defining AxiGrooves
Overriding AxiGroove Properties
Using the Gear Definition Dialog
AxiGroove Geometric Properties
Process and Operation Routing and Feasibility for Gears
Site Variables for Gears
Cost Model Variables for Gears
Setup Options for Gears
Working with Part Setups and SetupAxis GCDs
Setup Operations
Setup Axis GCDs
Principal Setup Axes
Overriding Principal Setup Axes
Rotational Setup Axes
System-activated and User-activated Setup Axes
Turning Axes
Displaying Setups, Associated Operations, and GCDs
Setup Axes and Operation Feasibility
GCD Accessibility and Tool Orientations
GCD Accessibility and Setup Axes
Operation Assignment for Machining
3-Axis Mill
4-Axis Mill
5-Axis Mill
2-AxisLathe and 3-AxisLathe
2-AxisLathe and 3-AxisLathe
Mill Turn
Multi-Spindle Machining
Other Secondary Processes
Packaging Processes
Packaging overview
Packaging machines
Packaging process routings
Packaging process setup
Packaging costing details
Cleaning Process
Ultrasonic Cleaning
Testing and Inspection Processes
CMM Inspection
CT Scan
Fluorescent Penetrant Testing
Hydrostatic Leak Testing
Magnetic Penetrant Testing
Xray Inspection Process
PCB
Overview for PCB
Supported PCB Variants
Supported Gerber and Drill Files for PCB
PCB Costing with Gerber and Drill Files
Geometric Cost Drivers for PCB
Materials for PCB
Process and Routing Overview for PCB
Layer Processing Cycle Examples
Process Listing for PCB
GCDs for PCB
Component GCD
Layer GCD
CommonHoleGorup GCD
Contour GCD
Materials for PCB
Raw Materials
Layer Material Configuration
Assigning Materials
Formulas and Calculations for PCB
Material Cost
Drill Registration Holes Formulas
Assemble and Press Layers Formulas
Oven Cure Layers Formulas
Drill Circuit Holes Formulas
Apply Photo Resist Formulas
Computed Board Thickness
User Inputs for PCB
PCB Node Setup Options
Material Stock Setup Options
Layer Material Setup Options
Drill Registration Holes Setup Options
Photolithography Setup Options
DES Setup Option
Dissolve Unexposed Photo Resist Setup Option
SES Setup Option
Via Plugging Setup Option
Wet Film Solder Mask Setup Options
Tack Dry Solder Mask Setup Option
Film Imaging Setup Options
Develop Solder Mask Setup Option
Cure Solder Mask Setup Option
Organic Solderability Preservative Option
Router Setup Options
Flying Probe Setup Options
Bed of Nails Setup Options
Stamp Setup Option
Site Variables for PCB
PCB Model Metadata
General Requirements for PCB Metadata
Drill Files Format
Gerber Files Format
GCD Extraction for PCB
PCB Model Metadata in XML Format
Supplemented PCB model metadata in XML format
Metadata Extraction for Files Generated by Different ECAD Systems
Cadence Allegro
PADS
Altium
Eagle
CADSTAR
PentaLogix
Unidentified ECAD Systems
PCBA
PCBA Cost Model Overview
General Process
PCBA Costing Requirements
PCBA Costing Workflow Diagram
User Inputs for PCBA Costing
Modifying and Importing Your PCBA BOM
Web-based data collection service
PCBA Costing Dialog Parameters
PCBA Optional Processes Dialog Parameters
Cost Algorithms and Calculations
PCBA Processes – User Guided
PCBA Processes – Assembly
Adhesive Dispense
Adhesive Staking
Adhesive Underfill
Automated Optical Inspection
Automated Xray Inspection
Bake In Test
Bake Out
Batch Wash
Boundary Scan
Component Prep Automated
Component Prep Manual
Component Prep Manual
Conformal Coat
Conformance Certification
Depanelization
Environmental Test
Final Assembly
Final Assembly Component Setup
Flying Probe Validation
Functional Test
Hand Wash
Heat Sink Install
HiPot Test
InCircuit Test
Inline Wash
Ion Chromatography
Jumper Wire Install
Jumper Wire Install
Light Up Test
PCB Flip
PCB Load
PEMS
Potting
PTH Auto Insert
PTH Component Setup
PTH Hand Install
PTH Hand Solder
Reflow
RF Test
Screen Printing
Selective Solder
Shunt Assembly
SMT Auto Placement
SMT Component Setup
SMT Hand Placement
SMT Hand Solder
SMT Visual Inspection
Software Load
Solder Jetting
Solder Paste Inspection
Stencil
Visual Inspection
Wave Solder
Process Defaults and Thresholds
Plastic Molding
Cost Model Overview
Cost Model Overview
Part Geometry for Plastic Molding
Materials for Plastic Molding
Machines for Plastic Molding
Tooling for Plastic Molding
Key Material Properties for Plastic Molding
Eject Deflection Temp
Mold Temp
Melting Temp
Thermal Conductivity of Melt
Density of Melt
Specific Heat
Injection Pressure Max and Injection Pressure Min
Costing Flow
GCD Extraction for Plastic Molding
How aPriori Selects Draw Direction for Plastic Molding
Assigning Holes and Voids to Slides and Lifters
Feasibility and Routing
Compression Molding Feasibility
Compression Molding Machine Selection
Cost Algorithms and Calculations
Primary Direct Costs for Plastic Molding
Other Direct Costs for Plastic Molding
Material Utilization for Plastic Molding
Times for Plastic Molding
Compression Molding Times
Nominal Wall Thickness
Required Shot Size
Flow Appraisal
Required Clamp Force
Cavity Orientation
Dimensions of the Plastic Forming Region
Number and Layout of Mold Cavities
Runner System Model
Other Calculations
Tooling Cost
Tooling Report
Compression Molding Tooling Costs
Hard Tooling Cost Calculation
Total Tool Material Labor and Misc Services Cost Calculation
Mark Up Calculation
S G and A Calculation
Total Tool Material Cost Calculation
Total Rib Insert Volume Calculation
Total Tool Labor Cost Calculation
Labor Cost – Mold Assembly Calculation
Labor Cost – Spotting Calculation
Labor Cost – Tool Trode Certification CMM Calculation
Labor Cost – EDM Calculation
Labor Cost – Drilling Heater Lines Calculation
Labor Cost – Finishing Bench Calculation
Labor Cost – CNC Machining Calculation
Labor Cost – General Machining Calculation
Number of Clamp Plate Holes Calculation
Number of Ejector Plates Holes Calculation
Mold Closure Complexity Calculation
Purchased Tool Components Cost Calculation
Total Clamp Plates General Machining Hours Calculation
Total Core Cavity General Machining Hours Calculation
Total Ejector Box General Machining Hours Calculation
Total Rib Insert General Machining Hours Calculation
Estimated Internal and External 3D Perimeter Calculations
Design Cutter Path Hours Calculation
Clamp Plate Drill Hours Calculation
Clamp Plates Surface Area Calculation
Ejector Box Rails Surface Area Calculation
Ejector Plates Surface Area Calculation
Flash Ridge and Cavity Area Calculations
Miscellaneous Services Calculation
Miscellaneous Costs
User Inputs for Plastic Molding
Accessing and Modifying User Inputs
User Inputs Affecting Overall Cost
User Inputs Affecting SFM Material Utilization
User Inputs Affecting Tooling Costs
User Inputs Affecting Mold Design
User Inputs for Compression Molding
Process Defaults and Thresholds
Accessing Cost Model Variables for Plastic Molding
IM, RIM, and SFM Cost Model Variables
Compression Molding Cost Model Variables
Sustainability Data for Plastic Molding
Design Guidance Configuration for Plastic Molding
Material Issues: Wall Thickness Thresholds
Draft Issues: Draft Angle Thresholds
Radius Issues: Minimum Internal and External Edge Radius
Proximity Issues: Hole Proximity
Hole Issues: Length-to-Diameter Ratio
Design Guidance Configuration for Compression Molding
Powder Metal
Powder metal overview
Powder metal processes
Powder metal material
Powder metal material utilization
Powder metal machines
Powder metal process routings
Powder metal process setup options
Powder metal costing details
Rotational and Blow Molding
Rotational and blow molding overview
Rotational and blow molding overview
Rotational and blow molding material
Rotational and blow molding material composition
Rotational and blow molding material utilization
Rotational and blow molding machines
Rotational molding process setup
Number of drop boxes
Number of labels applied to one part
Cost per label applied to the part
Expected part shrinkage percentage
Mold length margin
Mold width margin
Mold height margin
Mold spacing margin
Total number of molds used
Colorant
Enable part mirroring
Blow molding process setup
Number of machine operators
Number of labels applied to one part
Cost per label applied to the part
Maximum wall thickness
Mold temperature
Router process setup
Rotational and blow molding costing details
Sheet Metal - Hard Tooled
Cost Model Overview for Hard Tooled Sheet Metal
Hard Tooled Sheet Metal General Process
Part Geometry for Hard Tooled Sheet Metal
Materials and Stock Forms for Hard Tooled Sheet Metal
Material Utilization and Part Nesting for Hard Tooled Sheet Metal
Machines for Hard Tooled Sheet Metal
Tooling for Hard Tooled Sheet Metal
GCD Extraction for Hard Tooled Sheet Metal
Blank GCD for Hard Tooled Sheet Metal
Main Surface for Hard Tooled Sheet Metal
LIES_OUTSIDE Relation for Hard Tooled Sheet Metal
Peninsular Ratio Property for Hard Tooled Sheet Metal
Cam Bundling for Hard Tooled Sheet Metal
Surface-only CAD Models for Sheet Metal
Routing and Feasibility for Hard Tooled Sheet Metal
Sheet Metal Process Routings
Sheet Metal Process Routings
Sheet Metal Process Routings
User Inputs for Hard Tooled Sheet Metal
Progressive die process setup
Tandem Die Process Setup
Design Guidance Configuration for Sheet Metal
Sheet Metal - Hydroforming
Cost Model Overview for Hydroforming
General Process for Hydroforming
GCDs for Hydroforming
Material and Stock Forms for Hydroforming
Material Utilization and Part Nesting for Hydroforming
Machines for Hydroforming
Tooling for Hydroforming
GCD Extraction for Hydroforming
Blank GCD
Xsection GCD
Ram Direction GCD
Main Surface GCD
Form GCD
StraightBend GCD
Routing and Feasibility for Hydroforming
Process Routing for Hydroforming
Operation Assignment for Hydroforming
Process Feasibility for Hydroforming
Material Stock Selection for Hydroforming
Material Stock Selection for Offline Blanking Routings
Material Stock Selection for Laser Cut and Router Cut Routings
Machine Selection for Hydroforming
Hydroform Machine Selection
Offline Blank Machine Selection
Formulas for Hydroforming
Yields for Hydroforming
Material Cost and Utilization for Hydroforming
Labor and Setup Costs for Hydroforming
Cycle Time for Offline Blanking
Cycle Time for the Hydroform Process
Expendable Tooling Cost for the Hydroform Process
User Inputs for Hydroforming
Sheet Metal: Hydrforming Options
Hydroform Fluid Cell Options
Hydroform Cycles Option
Coil Material Stock Options
Sheet Material Stock Options
Hydroform Options
Offline Blank Options
Sheet Metal - Roll Forming
Roll Forming Overview
About Roll Forming
Roll Forming Line and Processes
Geometry Extraction for Roll Forming
Line Speed for Roll Forming
Key Custom Outputs for Roll Forming
Part Summary Tab for Roll Forming
Roll Forming Mill Process
Punch Press Process for Roll Forming
Inline Welding Processes for Roll Forming
Tooling for Roll Forming
Roll Forming Routing and Feasibility
Coil Flattener Routing
Scissor Cut-Off Operation Feasibility for Roll Forming
Punching Configurations for Roll Forming
Punching Achievable Tolerance for Roll Forming
Form Punching Feasibility for Roll Forming
Number of Roll Stations for Roll Forming Mill
Profile Bending for Roll Forming
Formulas and Calculations for Roll Forming
Material Utilization for Roll Forming
Cycle Time for Roll Forming
Labor Time for Roll Forming
Roll Forming Batch Setup Costs
Maximum Line Speeds for Roll Forming
Cut-Off Press Maximum Line Speed for Roll Forming
Integrated Laser Welding Maximum Line Speed for Roll Forming
Integrated TIG Welding Max Line Speed for Roll Forming
Punch Press Max Line Speed for Roll Forming
Roll Forming Mill Max Line Speed
Die Acceleration Formula Derivation for Roll Forming
Total Batch Stoppage Time for Roll Forming
Stock Coil Length for Roll Forming
Coil End Welding Time for Roll Forming
Setup Options for Roll Forming
Sheet Metal - Roll Forming Setup Options
Manufacturing Operation for Stamp GCDs
Enable Scrap Material Credit for Roll Forming
Enable Scrap Part Credit for Roll Forming
Roll Forming Routing Setup Options
Cross Section Tolerance for Roll Forming
Inline Punching Feature Tolerance for Roll Forming
Roll Forming Mill Type
Roll Forming - Coil Setup Options
Line Speed
Part Length Tolerance
Cut Off Measurement System for Roll Forming
Cut-Off Operation Type
Part Spacing for Roll Forming
Stock Coil Outer Diameter
Stock Coil Inner Diameter
Coil Setup Method
Uncoiler Type for Roll Forming
Integrated Welding Process
Prefer Post Punching for Roll Forming
Prefer Roll Mill Profile Bending
Number of Parts per Pack for Roll Forming
Banding Time per Pack for Roll Forming
Batch Stoppage Time for Packing
Coil Flattener Setup Option for Roll Forming
Coil Flattener Batch Stoppage Time for Roll Forming
Cut-Off Press Setup Options for Roll Forming
Cut-Off Operation Time for Roll Forming
Number of Hits per Die Change for Roll Forming
Die Changeover Time for Cut-Off Press for Roll Forming
Batch Stoppage Time for Cut-Off Press for Roll Forming
Die Tooling Material for Cut-Off Press for Roll Forming
Die Tooling Coating for Cut-Off Press for Roll Forming
Blade Material for Cut-Off Press for Roll Forming
Holder Material for Cut-Off Press
Insert Material for Cut-Off Press for Roll Forming
Minimum Part Height Plus Allowance for Cut-Off Press for Roll Forming
Part Height Allowance for Cut-Off Press
Post Height Multiplier for Cut-Off Press
Cut-Off Freight Cost for Roll Forming
Cut-Off Carrying Total Cost for Roll Forming
Cut-Off Gage Cost for Roll Forming
Cut-Off Tool Heat Treat for Roll Forming
Cut-Off Tooling Welding Cost for Roll Forming
Integrated HFI Welding Setup Options for Roll Forming
Integrated HFI Welding Batch Stoppage Time for Roll Forming
Integrated Laser Welding Setup Options for Roll Forming
Integrated Laser Welding Batch Stoppage Time
Integrated Laser Welding Weld Depth for Roll Forming
Integrated Rotary Spot Welding Setup Options for Roll Forming
Integrated Rotary Spot Welding Batch Stoppage Time for Roll Forming
Integrated TIG Welding Setup Options for Roll Forming
Integrated TIG Welding Batch Stoppage Time for Roll Forming
Integrated TIG Welding Weld Depth for Roll Forming
Punch Press Setup Options for Roll Forming
Punch Press Operation Time for Roll Forming
Punch Press Number of Hits per Die Change for Roll Forming
Punch Press Die Changeover Time for Roll Forming
Punch Press Batch Stoppage Time for Roll Forming
Punch Press Die Tooling Material for Roll Forming
Punch Press Die Tooling Coating for Roll Forming
Punch Press Top Parallel Height Cap for Roll Forming
Punch Press Post Height Multiplier for Roll Forming
Punch Press Part Height Allowance for Roll Forming
Punch Press Minimum Part Height Plus Allowance for Roll Forming
Punch Press Punch Freight Cost for Roll Forming
Punch Press Punch Carrying Total Cost for Roll Forming
Punch Press Punch Gage Cost for Roll Forming
Punch Tool Heat Treat for Roll Forming
Punch Press Punch Tooling Welding Cost for Roll Forming
Roll Forming Mill Setup Options
Total Cost of Roll Forming Die Tools
Select Tool Material for Roll Forming Mill
Tool Coating for Roll Forming Mill
Batch Stoppage Time for Roll Forming Mill
Number of Finishing Passes for Roll Forming Mill
Bending Precedence for Roll Forming Mill
Uncoiler Setup Options for Roll Forming
Coil End Welding Time for Roll Forming
Coil Threading Time for Roll Forming
Uncoiler Batch Stoppage Time for Roll Forming
Design Guidance Configuration for Sheet Metal – Roll Forming
Design Guidance Configuration for Sheet Metal – Roll Forming
Sheet Metal - Transfer Die
Cost Model Overview for Transfer Die
Transfer Die General Process
Part Geometry for Transfer Die
Materials and Stock Forms for Transfer Die
Material Utilization and Part Nesting for Transfer Die
Yields for Transfer Die
Times for Transfer Die
Machines for Transfer Die
Tooling Overview for Transfer Die
Transfer Die Quick Start
Offline Blanking
Die Station 1: Drawing
Die Station 2: Edge Trimming, Direct Piercing, and Cam Piercing
Die Station 2: Edge Trimming, Direct Piercing, and Cam Piercing
GCD Extraction for Transfer Die
Blank GCD
Ram Direction for Transfer Die
Main Surface for Transfer Die
Form GCD
Cam Bundling for Transfer Die
LIES_NEAR Relation
LIES_OUTSIDE Relation
Surface-only CAD Models for Transfer Die
Tooling for Transfer Die
Tool Life for Transfer Die
Tooling Bill of Materials for Transfer Die
Customizing Tooling Costs for Transfer Die
Primary Forming for Transfer Die
Sustainability Data for Transfer Die
User Inputs for Transfer Die
Setup Options for Transfer Die
Process Defaults and Thresholds for Transfer Die
Sheet Metal - Soft Tooled
Cost Model Overview
General Process
Part Geometry
Materials and Stock Forms
Machines
Tooling
GCD Extraction
Feasibility and Routing
Process-level Routing
Process-level Feasibility
Material Selection
Machine Selection
Operation-level Feasibility and Routing
Chemical Milling
Cost Algorithms and Calculations
Material Cost and Utilization
Yields for Sheet Metal
Deslag
Bend Brake
Laser Cut, Oxy Fuel Cut, Plasma Cut
Fiber Laser Cut
Waterjet Cut
Roll Bending (2-, 3-, and 4-roll)
3D Laser
Cut-to-Length, Shear
Turret Press, Laser Punch, Plasma Punch
User Inputs
Top-level Process Setup Options
Part Nesting Options
Bend Brake Options
Bevel Cutting Options
Minimum Hole Diameter for Punching, Nibbling, and Perforating
Minimum Hole Diameter for Laser, Fiber Laser, and Plasma Cutting
Minimum Hole Diameter for OxyFuel and Waterjet Cutting
Kerf Width for Laser, Fiber Laser, and Plasma Cutting
Kerf Width for OxyFuel and Waterjet Cutting
Fiber-laser-cut-specific options
Perforating Setup Options
Number-of-hits Options
Laser Cut and Fiber Laser Cut Options
Laser Punch Options
Plasma Cut Options
Plasma Punch Options
Turret Press Options
Roll Bending Inputs
Conical Roll Bending Inputs
Waterjet-Cut-specific Inputs
Sustainability Data for Sheet Metal
Process Defaults and Thresholds
Design Guidance Configuration for Sheet Metal
Hole Proximity Guidance Configuration
Bend Guidance Configuration
Blank (Edge Radii and Utilization) Guidance Configuration
Sheet Metal - Stretch Forming
Stretch Forming Overview
Stretch Forming Processes
Transverse and Longitudinal Stretch Forming
Stretch Forming Geometry
Stretch Forming Materials and Stock Forms
Stretch Forming Machines
Stretch Forming Tooling
GCD Extraction for Stretch Forming
Blank GCD
Xsection GCDs
Ram Direction GCD
Form GCDs
Routing for Stretch Forming
Process Feasibility for Stretch Forming
Stretch Form Process Feasibility
Xsection Curve Height for Stretch Forming
Machine Selection for Stretch Forming
Cold Storage Machine Selection
Stretch Form Machine Selection
Bench Operation Machine Selection
Router Machine Selection
Material Stock Selection for Stretch Forming
Formulas for Stretch Forming
Yields for Stretch Forming
Material Cost and Utilization for Stretch Forming
Labor and Setup Costs for Stretch Forming
Cycle Time for the Stretch Form Process
Expendable Tooling Cost for the Stretch Form Process
Formulas for the Bench Operation Process
Formulas for the Cold Storage Process
Formulas for the Router Process
User Inputs for Stretch Forming
Setup Options for Sheet Metal – Stretch Forming
Setup Options for Stretch Forming Cycles
Setup Option for Cold Storage
Setup Options for Bench Operation
Setup Options for Router
Process Defaults and Thresholds for Stretch Forming
Sheet Plastic
Sheet Plastic Overview
About Sheet Plastic
Sheet Plastic Processes
Sheet Plastic Material
Sheet Plastic Machines
Sheet Plastic GCD Extraction
Sheet Plastic Undercuts and Core Bundles
Sheet Plastic Routing and Feasibility
Sheet Plastic Calculations and Times
Material Cost and Utilization for Sheet Plastic
Cycle Time for Sheet Plastic
Labor Time for Sheet Plastic
Tooling Costs for Sheet Plastic
Tooling Costs Overview
Tooling Calculations Overview
Total Tool Material Labor and Misc Services Cost
SGandA Cost
Mark Up Cost
Design Cost
Design Cutter Paths Cost
Material and Labor - Total Tool Material Cost
Material and Labor - Total Tool Labor Cost
Miscellaneous Services Cost
Setup Options for Sheet Plastic
Sheet Thermoforming Setup Options
Thermoforming Process Setup Options
Router Setup Options
Surface Treatment
Surface Treatment Cost Model Overview
Surface Treatment Feasibility and Routing
Surface Treatment Routing
Surface Treatment Feasibility
Surface Treatment Machine Selection
Conveyor Conversion Coating Machine Selection
Conveyor Dry Machine Selection
Conveyor Oven Cure Machine Selection
Conveyor Part Loading Machine Selection
Conveyor Part Unloading Machine Selection
Conveyor Powder Coating Machine Selection
Conveyor Shot Blast Machine Selection
Surface Treatment Cost Algorithms and Calculations
Surface Treatment Accounting Calculations
Surface Treatment Yield Calculations
Anodize Formulas
Bead Blast and Sand Blast Formulas
Black Oxide Formulas
Conveyor Abrasive Finishing Formulas
Conveyor Conversion Coating Formulas
Conveyor Dry Formulas
Conveyor Oven Cure Formulas
Conveyor Part Loading Formulas
Conveyor Part Unloading Formulas
Conveyor Powder Coating Formulas
Conveyor Processes Formulas
Conveyor Shot Blast Formulas
Degrease Formulas
Painting Formula
Passivation formulas
Plating Process Formulas
Powder Coat Cart Formulas
Screen Printing Formulas
Shot Blast Formulas
Shot Peen Formulas
Mask-Bench Formulas
Mask Spray Formulas
Oven Cure Formulas
Vibratory Finishing Formulas
Wet Coat Line Formulas
Surface Treatment User Inputs
Anodize Inputs
Black Oxide Inputs
Conveyor Abrasive Finishing Inputs
Conveyor Conversion Coating Inputs
Conveyor Processes Inputs
Conveyor Shot Blast Inputs
Degrease Inputs
Manual Paint Inputs
Mask-Bench Inputs
Mask Spray Inputs
Passivation Inputs
Plating Processes Inputs
Powder Coat Cart Inputs
Powder Coat Conveyor Inputs
Screen Printing Inputs
Shot Blast Inputs
Shot Peen Process Inputs
Vibratory Finishing Inputs
Wet Coat Line Inputs
Sustainability Data for Surface Treatment
Process Defaults and Thresholds
User Guided Costing
Overview
Benefits of User-guided Costing
User-guided Digital Factories and Processes
User-guided Costing Steps
Detailed Information on User-guided Cost Models
Creating or Opening a Virtual Part
Using Settings from a Start Part
Entering Production Information
Entering Geometric Information
Administering Start Parts
User Guided Injection Molding
Cost Model Overview
General Process
Part Geometry
Materials and Stock Forms
Machines
Tooling
Geometric User Inputs
Part Volume
Part Length, Width, and Height
Part Surface Area, Projected Area and Perimeter, and Wall Thickness
Undercut Depths
Number of Lifters, Inserts and Unscrewing Mechanism
Feasibility and Routing
Process-level Feasibility and Routing
Machine Feasibility and Selection
Cost Algorithms and Calculations
Primary Direct Costs
Other Direct Costs
Yields
Material Utilization
Times
Nominal Wall Thickness
Required Shot Size
Required Clamp Force
Number of Mold Cavities
Mold Dimensions
Tooling Cost
Additional User Inputs
Process Defaults and Thresholds
User Guided Sheet Metal - Progressive Die
Cost Model Overview
General Process
Part Geometry
Materials
Machines
Tooling
Geometric Inputs
User Guided Costing Node
Sheet Metal PG Node
Progressive Die Routing Node
Progressive Die Node
Feasibility and Routing
Process-level Feasibility
Material Selection
Machine Selection
Cost Algorithms and Calculations
Material Cost and Utilization
Accounting Calculations
Cycle Time Calculation
Tooling Calculation
Additional User Inputs
Trim Strip Applied to Length and Width of Part
Width of Addendum Added to Blank Size [per side]
Maximum Strip Width
Minimum Strip Width
Number of Parts Stamped Concurrently
Blank XY Orientation within Part Strip
Pierce Before or After Forms
Press Carrier Strip Type
Single Edge Carrier Strip Width
Double Edge Carrier Strip Width
Pitch Margin Adder for Center Carrier Strip Type
Press French Stop
Coil Pitch
Coil Width
Process Defaults and Thresholds
User Guided Sheet Metal - Stage Tooling
Cost Model Overview
General Process
Part Geometry
Materials
Machines
Tooling
Geometric Inputs
User Guided Node
Sheet Metal PG Node
Stage Tooling Routing Node
Stage Tooling Node
Feasibility and Routing
Process-level Feasibility
Material Selection
Machine Selection
Cost Algorithms and Calculations
Material Cost and Utilization
Accounting Calculations
Cycle Time Calculation
Tooling Calculation
Additional User Inputs
Width of Addendum Added to Blank Size [per side]
Stock Length Margin
Stock Width Margin
Process Defaults and Thresholds
User Guided Sheet Metal - Turret Press
Cost Model Overview
General Process
Part Geometry
Materials
Machines
Tooling
Geometric Inputs
User Guided Costing Node
Sheet Metal PG Node
Turret Press Routing Node
Turret Press Node
Bend Brake Node
Bend Brake Node
Feasibility and Routing
Process-level Feasibility
Material Selection
Machine Selection
Cost Algorithms and Calculations
Yields
Turret Press Material Cost and Utilization
Turret Press Accounting Calculations
Bend Brake Accounting Calculations
Turret Press Cycle Time Calculation
Turret Press Expendable Tooling Costs
Bend Brake Cycle Time Calculation
Process Defaults and Thresholds
Wire Harness
Cost Model Overview
General Process
Cost Driver Extraction
Cost Algorithms and Calculations
Material Cost Calculations
Cutting and Stripping (User Guided)
Wire Termination
Connector Assembly
Splice
Harness Layout
Branch Covering
Braid
Label
Test
User Inputs
Process Defaults and Thresholds
Process Limitations:
aPriori Professional Release Notes
What's New Summary
What’s New Details for 2023 R1
Digital Factory Enhancements
Linking Custom Materials to Source Materials
Generic Materials for Material Linking
Adjustment Factors for Linked Material Values
System Administration Enhancements
Sustainability Insights
Usability and Workflow Enhancements
Updated Behavior for Assemblies with Missing Sub-Component CAD files
BOM Loader Support for Status and Cost Maturity
Additive Manufacturing Enhancements
Casting - Die Enhancements
Casting - Sand Enhancements
Casting - Investment Enhancements
Extrusion Enhancements (Bar and Tube Fabrication)
Forging Enhancements
Improved Thickness Assessment for the Forging Process Groups
Read Draw Direction from CAD File
Machining Enhancements
PCB Fabrication Enhancements
Plastic Molding Enhancements
Powder Metal Enhancements
Sheet Plastic Enhancements
Wire Harness Enhancements
Regional Database Libraries for 2023-02
Platform and CAD Support Updates
Language Support Updates
Resolved Issues
Known Issues and Workarounds
Upgrading to aPriori Professional 2023 R1
Contacting aPriori Customer Support
What's New Summary
What's New Details
Multi-Spindle Cost Model Expansions and Enhancements
Extrusions Enhancements
Casting Enhancements
Plastic Molding Enhancements
Sheet Metal Enhancements
Sheet Metal Roll - Forming Enhancement
Machining Enhancements
Assembly and Welding Enhancements
PCB Fabrication Enhancements
Secondary Processes Process Group Enhancement
Usability Enhancements
Digital Factory Configuration Enhancement
Regional Database Libraries
Platform and CAD Support Updates
Language Support Updates
Resolved Issues
Compatibility
Upgrading to aPriori Professional 2022 R1 SP1
aPriori Professional Release Notes
Release Notes for aPriori Professional
Key Features
What's New Summary
What's New Details
Sheet Metal Enhancements
Plastic Molding Enhancements
Machining Cost Model Enhancements
2-Model Machining Cost Model Enhancements
Casting Enhancements
Assembly Cost Model Enhancements
Surface Treatment Enhancements
PCB Enhancements
Design for Manufacturability and Design to Cost Enhancements
Usability and Performance Enhancements
Regional Database Libraries for 2022-02
Platform and CAD Support Updates
License Manager Service Updates (Applicable Only to On-Premise Deployments)
Language Support Updates
Resolved Issues
Known Issues and Workarounds
Upgrading to aPriori Professional 2022 R1
Contacting aPriori Customer Support
aPriori Pro Release Notes 2021 R1 SP2
About the Release Notes
What's New in 2021 R1 SP2
Upgrading to aPriori Pro 2021 R1 SP2
Contacting aPriori Customer Support
aPriori Professional Release Notes 2021 R1 SP1
About the Release Notes
What’s New – Quick Summary
What’s New – The Details
PCB Fabrication
Assembly and Welding Cost Model Enhancements
Machining Cost Model Enhancements
Investment Casting Cost Model Enhancements
Sheet Metal Cost Model Enhancements
Bar & Tube Fabrication Cost Model Enhancements
Plastic Molding Cost Model Enhancements
Digital Factory (VPE) Management and Configuration
aPriori 2021-08 Regional Data Libraries
Platform and CAD Support Updates
License Manager Service Updates (On-Premise Only)
Language Support Updates
Resolved Issues
Known Issues and Workarounds
Upgrading to aPriori Pro 2021 R1 SP1
Contacting aPriori Customer Support
aPriori Professional Release Notes 2021 R1
About the Release Notes
What’s New – Quick Summary
What’s New – The Details
General Updates
PCB Fabrication and PCB Assembly
Plastic Molding Cost Model Enhancements
Sheet Metal Cost Model Enhancements
Machining Cost Model Enhancements
Assembly and Welding Cost Model Enhancements
Casting Cost Model Enhancements
Forging Cost Model Enhancements
Surface Treatment Cost Model Enhancements
Usability Enhancements
System Administration Enhancements
Digital Factory (VPE) Management and Configuration
aPriori 2021-04 Regional Data Libraries
Platform and CAD Support Updates
Language Support Updates
Issues Resolved in aPriori Professional 2021 R1
Known Issues and Workarounds
Upgrading to aPriori Professional 2021 R1
Contacting aPriori Customer Support
Cost Impact for Upgrades
Guide Overview
Assessing Impact
Product Factors that Shape Cost Impact
Impact Assessment Steps
Change Summary Tables
Detailed Impact Assessment by Process Group
All Process Groups
Additive Manufacturing
Assembly
Assembly Molding
Assembly Plastic Molding
Bar & Tube
Casting - Die
Casting - Investment
Casting - Sand
Machining
Plastic Molding
Sheet Plastic
Wire Harness
Guide Overview
Assessing Impact
Product Factors that Shape Cost Impact
Impact Assessment Steps
Change Summary Tables
Detailed Impact Assessment by Process Group
All Process Groups
Assembly
Assembly Molding
Assembly Plastic Molding
Casting - Die
Casting - Investment
Casting - Sand
Machining
Multi-Spindle Machining
PCB
Plastic Molding
Sheet Metal
Sheet Metal - Hydroforming
Sheet Metal - Roll Forming
Sheet Metal - Stretch Forming
Sheet Metal - Transfer Die
Cost Impact for Upgrades to aPriori 2022 R1
Guide Overview
Assessing Impact
Product Factors that Shape Cost Impact
Impact Assessment Steps
Change Summary Tables
Detailed Impact Assessment by Process Group
2-Model Machining
Assembly
Bar & Tube
Casting - Die
Casting - Investment
Casting - Sand
Machining
Plastic Molding
Sheet Metal
Sheet Metal - Hydroforming
Sheet Metal - Stretch Forming
Sheet Metal - Transfer Die
Stock Machining
Surface Treatment
Cost Impact for Upgrades to aPriori Pro 2021 R1 SP2
Cost Impact for Upgrades to 2021 R1 SP1
Overview
Assessing Impact
Product Factors that Shape Cost Impact
Impact Assessment Steps
Change Summary Tables
Detailed Impact Assessment by Process Group
Assembly
Bar & Tube
Casting - Investment
Machining
PCB
Plastic Molding
Sheet Metal
Cost Impact for Upgrades to aPriori Pro 2021 R1
Guide Overview
Assessing Impact
Product Factors that Shape Cost Impact
Impact Assessment Steps
Change Summary Tables
Detailed Impact Assessment by Process Group
All Process Groups
2-Model Machining
Additive Manufacturing
Assembly
Assembly Molding
Assembly Plastic Molding
Bar & Tube
Casting - Die
Casting - Investment
Casting - Sand
Composites
Forging
Heat Treatment
Machining
Other Secondary Processes
Part Assembly
Plastic Molding
Powder Metal
Rotational & Blow Molding
Sheet Metal
Sheet Metal – Hydroforming
Sheet Metal – Stretch Forming
Sheet Metal - Transfer Die
Sheet Plastic
Stock Machining
Surface Treatment
User Guided
Regional Data Libraries 2023-02
Compatibility
What's New
New Regions across Saudi Arabia, Mexico, and India
Regional Factors for the aPriori Sustainability Module
Industry Standard Values for Material Injection Pressure Boundary Values
New Machines for the Casting-Investment, Sheet Metal and Sheet Plastic Process Groups
New Materials for the Plastic Molding and Sheet Plastic Process Groups
Economic Updates
Exchange Rates
Labor Rates
Total Manufacturing Rates
Material Rates
Installation
Regional Data Libraries 2023-10
Economic Updates
Exchange Rates
Labor Rates
Total Manufacturing Rates
Material Rates
Compatibility
Installation
Cloud System Requirements, Release Notes, and AppStream Guide
aPriori Cloud System Requirements
System Requirements Applicability
Application Compatibility
Cost Insight Admin Modules
Browser Requirements
Display Requirements
Graphics Drivers
Supported SAML IdPs
Network Latency Requirements
Licensing
Supported CAD File Upload Size
Supported CAD Applications and Formats
Supported PLM Systems
Supported Operating Systems
Localization and Translation
Excel Support for Spreadsheet Reports
Using aPriori Professional via AppStream
Logging in and out of aPriori Professional via AppStream
Login Requirements
Log in to aPriori Professional via the AppStream URL
Log in to aPriori Professional via the aPriori Cloud Home portal
AppStream Login Issues
aPriori Password Reset
Log out of AppStream
Working in the AppStream Environment
AppStream Toolbar Overview
Setting Your Region in AppStream
Session Timer
AppStream Directories
Uploading Files
Opening CAD Files in aPriori Professional
Downloading Files to Your Local File System
Creating Folders
Renaming Folders and Files
Deleting Folders and Files
Exporting Digital Factories
Exporting a Single Digital Factory
Exporting Multiple Digital Factories
Retrieving aPriori Log Files
Collaborating with Cost Insight Design Users
Troubleshoot AppStream Issues
aPriori Cloud Rlease Notes
aPriori Cloud Release Notes
About these Release Notes
Compatibility
What’s New for 2022 R1 SP1
Upgrading to aPriori Cloud 2022 R1 SP1
aPriori Cloud Release Notes
About these Release Notes
Compatibility
What’s New for 2022 R1
Synchronization of Assemblies Published in Cost Insight Design
Support for Creo® Assembly Welds in Assemblies Published in Cost Insight Design
Configurable Retention Policy for the aPriori File Management System
Improvements to File Open Error.
Step Assembly Performance Improvements
Known Issues
Upgrading to aPriori Cloud 2022 R1
Contacting aPriori Customer Support
On-Premise System Requirements and Installation Guides
System Requirements
Applicability of aPriori On-Premise Requirements
Compatibility of aPriori On-Premise Products
Network Requirements between Clients and Servers
aPriori On-Premise Licensing Configuration and Requirements
aPriori License Manager Service Server Requirements
aPriori Professional On-Premise Licensing Configuration and Requirements
Enterprise Platform On-Premise Licensing Configuration and Requirements
aPriori Professional Cost in aPriori MCAD Integration Licensing Requirements
aPriori Professional Requirements for On-Premise Deployments
aPriori Professional General Client and Server Requirements for On-Premise Deployments
aPriori Professional Additional Requirements for On-Premise Deployments
Graphics Drivers
Excel Support for Spreadsheet Reports
aPriori Professional Database Server Requirements for On-Premise Deployments
Additional aPriori On-Premise Performance Considerations
RAM versus Heap Memory
Recommendations for Large or Complex Environments
Bulk Costing Considerations
Supported CAD Applications, Versions, and Formats
Localization and Translation
aPriori Professional Limitations for On-Premise Deployments
Enterprise Platform Requirements for On-Premise Deployments
Enterprise Platform Client and Server Requirements for On-Premise Deployments
Enterprise Platform Database Server Requirements and Recommendations for On-Premise Deployments
Enterprise Platform Web Server Requirements for On-Premise Deployments
Enterprise Platform Limitations for On-Premise Deployments
aPriori Professional Installation
Planning the Installation
Releases and Installation Types
Update and Upgrade Paths
Acquiring the Installation Files
Acquiring the Installation Files
Summary of Required Procedures
Understanding Release Versions
Understanding Release Versions
Understanding Installation Types
Initial Installation
Planning the Initial Installation
Planning the Initial Installation
Planning the Initial Installation
Planning the Initial Installation
Planning the Initial Installation
Planning the Initial Installation
Planning the Initial Installation
Installing Prerequisite Software
Prerequisite aPriori License Manager Service Installation
Prerequisite Database Software
Clients
Installing a CAD Application
Installing and Configuring a Database
MySQL Installation and Configuration
Installing MySQL Server on Windows
MySQL server installation on Windows (MySQL Win Part 1)
MySQL Server Configuration screen (MySQL Win Part 2)
MySQL Workbench (MySQL Win Part 3)
Import standarddata.sql (MySQL Win Part 4)
Create a user and assign privileges (MySQL Win Part 5)
FOR Enterprise Platform ONLY - Edit the startup file (MySQL Win Part 6)
Restart the MySQL service (MySQL Win Part 7)
Anti-virus Software Exceptions for MySQL (MySQL Win Part 8)
Configure MySQL JBDC Time Zone property
Installing MySQL on Linux
MySQL Client Components (MySQL Linux Part 1)
MySQL Server Components (MySQL Linux Part 2)
Securing MySQL on Linux (MySQL Linux Part 3)
MySQL Options File in Linux (MySQL Linux Part 4)
Creating the aPriori database and users in Linux (MySQL Linux Part 5)
Oracle Installation and Configuration
Oracle Installation Prerequisites
Install and configure Oracle
Import the Oracle data files
Additional Oracle information
SQL Server Installation and Configuration
SQL Server Installation Prequisites
Install and configure SQL Server
aPriori Client Installation Adjustments
Creating and Deleting SQL Server database instances
Create a SQL Server database instance
Deleting SQL Server Databases
Installation Preparation
Install the aPriori Professional Client by Using the Setup Wizard
Open the aPriori Professional Setup Wizard
Welcome Screen
License Agreement
Select Destination Directory
Selecting Components
Document Cache Configuration
Database Schema Configuration
Database Schema Configuration
Database Schema Configuration
Database Schema Configuration
aPriori License Manager Service Configuration
Memory Configuration
Creo and Pro/ENGINEER Configuration
aPriori Properties Configuration
Bulk Costing Plug-In Properties Configuration
About to Install
Installation in Progress
Completing the Installation
Faster subsequent installations
Uninstalling aPriori Professional
Uninstall in Progress
Uninstall Done
File permissions
Silent Client Install
Configure and start aPriori
Configure and start aPriori
Configure and start aPriori
Configure and start aPriori
Configure and start aPriori
Configure and start aPriori
Configure and start aPriori
Manually connect to the CAD system:
Configuring the Test and Training Databases
Installing a Cost in aPriori CAD Plug-in
Installation Checklist
Database
Client
Update and Upgrade Installations
Requirements for Update and Upgrade Installations
Back Up the aPriori Professional Client
Database upgrade overview
Database upgrade methods
Which method should I choose?
Upgrading in a Test Environment
MySQL considerations
Definition of Terms
General prerequisites
Test Environment Upgrade
Prepare for the test update
Update Deployment Links
Install aPriori Professional in the Environment
Perform the database upgrade procedure
Run the upgrade or patch script
Run the Compatibility Script
Load Updated License Manage Service License
Install the Digital Factory baseline update
Acquire and Install Regional Data Libraries
Save Digital Factories to the Database
Import New aPrioriDefault.xsl File
Manually set defaults for new process groups
Extensively Test the Update
Update: Production Environment
Prepare for the production upgrade
Perform the update, adjusting as necessary
Performing a Full Database Migration
Prerequisites for migration
Overview of steps
Set up the Source Version
Export data out of the Source Version
Target Version Setup
No Error Message
Import the data in to the target version
Testing the Digital Factories
Plan and Schedule Production Changes
Upgrade the client software
Migration by Support
Overview of steps
Exporting, importing, and testing
Moving from Testing to Production
Troubleshoot aPriori as a Creo Toolkit Application
aP Wrapper Failure
SQL Server Export Tools
Export using SQL Server Management Studio (SSMS)
Exporting using aPriori’s PowerShell script
License Manager Service Installation
Guide overview
License Manager Service overview
License Manager Service installation overview
Installation Prerequisites
Add an SSL certificate to the LMS SSL Keystore
Install the License Manager Service
Uninstall the License Manager Service
Cost in aPriori Plug-in Installation Guides
Cost in aPriori CATIA-V5 Plug-in Installation Guide
Plug-in installation overview
Installation overview for On-Premise deployment
Plug-in installation overview
Installation Prerequisites
Prerequisites for On-Premise Deployment
Prerequisites for Cloud Deployment
Installation Using the Setup Wizard
Installation Using Silent Mode
Configure and Confirm the Plug-in Integration
Configure and Confirm a CATIA™ V5 aPriori On-Premise Integration
Configure and Confirm a CATIA™ V5 aPriori Cloud Integration
Repair a Cost in aPriori CATIA™ V5 Plug-in
Uninstall the Plug-in
Cost in aPriori Inventor Plug-in Installatoin Guide
Guide overview
Plug-in installation overview
Plug-in installation overview for On-Premise
Plug-in Installation Overview for aPriori Cloud
Plug-in Installation Prerequisites
Prerequisites for aPriori On-Premise
Prerequisites for aPriori Cloud
Installation using the Setup Wizard
Installation Using the Silent Installer
Configuring the Inventor aPriori Integration
Configure and Confirm an Inventor aPriori On-Premise Integration
Configure and Confirm an Inventor aPriori Cloud Integration
Repairing the Plug-in
Uninstall the Plug-in
Cost in aPriori SOLIDWORKS™ Plug-in Installation Guide
Guide overview
Plug-in installation overview
Installation overview for On-Premise
Installation overview for aPriori Cloud
Plug-in installation prerequisites
Prerequisites for On-Premise
Prerequisites for an aPriori Cloud deployment
Installation using the Setup Wizard
Installation using the Silent Installer
Configure a SOLIDWORKS™ aPriori Integration
Configure and Confirm a SOLIDWORKS™ aPriori On-Premise Integration
Configure and Confirm a SOLIDWORKS™ aPriori Cloud Integration
Repairing the Plug-in
Uninstalling the Plug-in
Cost in aPriori Solid Edge® Plug-in Installation Guide
Plug-in Installation Overview
Installation Overview for aPriori On-Premise Deployments
Installation Overview for aPriori Cloud Deployments
Plug-in Installation Prerequisites
Prerequisites for aPriori On-Premise Deployments
Prerequisites for aPriori Cloud Deployments
Install by Using the Setup Wizard]
Install by Using the Silent Installer
Configure and Confirm a Solid Edge® Integration
Configure and Confirm a Solid Edge® aPriori On-Premise Integration
Configure and Confirm a Solid Edge® aPriori Cloud Integration
Repairing the Plug-in
Uninstalling the Plug-in
Electronics Costing
PCBA Costing Module Installation
Guide Overview
PCBA Costing Module Installation Overview
PCBA Costing Module Installation Prerequisites
Install or Update aPriori Professional
Prepare to Import or Append UDAs
Installing the PCBA Costing Module
PCBA Costing Module Installation Prerequisites
Import User Defined Attributes for the Installation
Import Digital Factory (.vpe) Files for the Installation
Install Display Configuration Files
Configure BOM Loader Mappings for a PCBA Costing Module Installation
Confirm PCBA Costing Module Functionality
Electronics Costing User Guides
Overview
Electronics Costing Application and Modules
PCBA Costing
PCBA Costing Overview
User Inputs for PCBA Costing
Modifying and Importing Your PCBA BOM
Electronics Data Collection
PCBA Costing Dialog Parameters
Customizing Component Import Behavior Parameters
PCBA Optional Processes Dialog Parameters
Cost a PCBA
Process Defaults and Thresholds
Wire Harness Costing
Wire Harness Costing Requirements
Import and Cost a New Wire Harness
User Inputs
Process Defaults and Thresholds
Process Limitations
Electronics Costing Modules Release Notes 2021-07
About the Release Notes
What’s new for Electronics Costing Modules 2021-07
Upgrading to Electronics Costing Modules 2021-07
Contacting aPriori Customer Support
PCBA Costing Module Release Notes 2021-04
About the Release Notes
What’s new in aPriori PCBA Costing Module 2021-04
Upgrading to aPriori PCBA Costing Module 2021-04
Contacting aPriori Customer Support
Electronics Costing Modules Release Notes 2020-09
About the Release Notes
What’s new in aPriori Electronics Costing Modules 2020-09
Upgrading to aPriori Electronics Costing Modules 2020-09
Contacting aPriori Customer Support
Electronics Data Collection Release Notes 2020-10
About the Release Notes
What’s new in aPriori Electronics Data Collection 2020-10
Resolved Issues
Upgrading to aPriori Electronics Data Collection Costing 2020-10
Contacting aPriori Customer Support
Electronics Costing Release Notes 2020-03
About the Release Notes
What’s new in aPriori Electronics Costing 2020-03
Known Issues and Workarounds
Upgrading to aPriori Electronics 2020-03
Contacting aPriori Customer Support
Wire Harness Costing Module Installation 2021-07
Guide Overview
Wire Harness Costing Module Installation Overview
Installation Prerequisites
Install or Update aPriori Professional
Prepare to Import or Append UDAs
Installing the Wire Harness Costing Module
Wire Harness Costing Module Installation Prerequisites
Import UDAs for the Module Installation
Import VPEs for the Module Installation
Install Display Configuration Files for a Wire Harness Costing Module Installation
Configure BOM Loader Mappings for the Module Installation
Confirm Wire Harness Costing Module Functionality
Electronics Data Collection Release Notes 2020-10
About the Release Notes
What’s new in aPriori Electronics Data Collection 2020-10
Resolved Issues
Upgrading to aPriori Electronics Data Collection Costing 2020-10
Contacting aPriori Customer Support