Skip to content

Composites

Cost impact for upgrades to aPriori Professional 2021 R1

Cost Model Version Summary

The following table shows the cost model version numbers for the last three major releases:

Release Cost Model Version Status
aPriori 2021 R1 40 New with this release
aPriori2020 R1 20 (20.1.0) / 30 (20.1.1) From a prior release
aPriori 2019 R2 0 (19.2.0) / 10 (19.2.1) N/A

Summary of Platform Changes

The table below indicates whether there were geometry and/or cost engine changes for this process group. Such changes could impact costing results for configured Digital Factories.

Platform Area Was there a Change?
Geometry Yes
Cost Engine No

Change Summary by Area

The table below indicates whether there were geometry and/or cost engine changes for this process group. Such changes could impact costing results for configured Digital Factories. For the first type of change (geometry or cost engine changes), the table indicates the impact level (High, Medium, Low, or No).

Area Impact?
Geometry or cost engine changes that could impact configured Digital Factories LOW
Bug fixes or small improvements to prior cost model versions that could Impact configured Digital Factories NO
Cost model changes that do not affect configured Digital Factories NO

Details: Geometry or Cost Engine Changes that Could Impact Configured Digital Factories

The following changes might impact costing, even for Digital Factories that use earlier cost model versions.

  • Core Thickness and Machining Time: This release corrects a rare problem with the determination of core thickness and volume that could occur when a core body in a CAD model was modeled by a set of joined surfaces with the surface normal pointing inward rather than outward as expected. The problem led the cost model to choose excessively small tools for core machining in some cases. As a result of this change, machining cycle time for some cores might decrease, compared to the previous release.

Details: Bug Fixes or Small Improvements to Prior Cost Model Versions

The following changes might impact costing for Digital Factories that use earlier cost model versions.

  • NO IMPACT

Details: Cost Model Changes that Do Not Affect Configured Digital Factories

The following changes do not affect costings with Digital Factories that use earlier cost model versions. The changes are available only in the latest cost model version.

  • NO IMPACT