Skip to content

Change Summary Tables

Geometry and Cost Engine Changes

The table below contains a row for each geometry or cost engine change. Each row lists the following:

  • Process group to which the change applies
  • Impact level of the change (High, Medium, or Low)
  • Whether the change can or must be disabled using site variables.
  • Description of the change and its impact

Changes are geometry changes unless explicitly labeled Cost engine change in the description.

The entries are arranged alphabetically by process group.

You can use this table to guide you in performing Step 2 and Step 3 of impact assessment (see Impact Assessment Steps). Click on the name of a process group in the first column to get more information on changes for that process group.

(In this release, 2025 R1 SP2, there is only one process group with geometry changes: 2-Model Machining.)

Process Group Impact Level Can be Disabled? Must be Disabled with Prior CMVs? Impact Description
2-Model Machining Low No No The auto-alignment algorithm now better aligns turned (rotationally symmetric) parts with their net shape parts, in the axial direction.
For certain turned parts, costs and times may change compared to the previous release, and there may be fewer warnings to the end user concerning the accuracy of the machined model.

Before you upgrade, review the process groups you use, and identify the ones have that have changes that impact aPriori estimates. Once you have determined whether to accept or disable each High-impact geometry or cost engine change for the process groups that you use, you can upgrade to the new release. If there are no High-impact geometry or cost engine changes, you can upgrade to the new release.

aPriori also recommends that you review the cost model changes as well as the Low- and Medium-impact geometry and cost engine changes for the process groups you use.

All Changes

The table below indicates which categories of change impact each process group, as well as the cost model versions introduced in each of the last four releases.

Process names in the table’s first column link to process-group-specific sections which can help you to perform Steps 3 and 4 of your impact assessments (see Impact Assessment Steps). Each of the sections contains summary tables as well as change details grouped by the following three categories:

  • Geometry or cost engine changes that could impact configured Digital Factories: these are changes that might impact costing even for Digital Factories that use earlier cost model versions.
  • Bug fixes or small improvements to prior cost model versions that could impact configured Digital Factories: these are back-ported bug fixes, which might impact costing for Digital Factories that use earlier cost model versions.
  • Cost model changes that do not affect configured Digital Factories: these are changes that do not affect costings with Digital Factories that use earlier cost model versions.
Process Group Geometry or Cost Engine Changes Bug Fixes or Small Improvements to Prior Cost Model Versions Changes to New Cost Model Version Latest Cost Model Version in Each of the Last Four Releases
2-Model Machining YES NO NO 130, 130, 130, 130
Additive Manufacturing NO NO NO 170, 170, 170, 170
Assembly NO NO NO 240, 240, 240, 230
Assembly Molding NO NO NO 130, 130, 130, 120
Assembly Plastic Molding NO NO NO 80, 80, 80, 70
Bar &Tube NO NO NO 270, 270, 260, 250
Casting - Die NO NO YES 220, 210, 200, 190
Casting - Investment NO NO NO 120, 120, 110, 100
Casting - Sand NO NO NO 210, 210, 200, 190
Composites NO NO NO 90, 90, 90, 80
Forging NO NO YES 280, 270, 260, 250
Heat Treatment NO NO NO 190, 190, 190, 180
Machining NO NO YES 360, 350, 340, 330
Multi-Spindle Machining NO NO NO 50, 50, 40, 40
Other Secondary Processes NO NO NO 160, 160, 160, 160
PCB NO NO NO 80, 80, 70, 70
Part Assembly NO NO NO 110, 110, 110, 110
Plastic Molding NO NO YES 300, 290, 280, 270
Powder Metal NO NO NO 170, 170, 170, 170
Rotational & Blow Molding NO NO NO 170, 170, 170, 170
Sheet Metal NO NO NO 310, 310, 310, 300
Sheet Metal - Hydroforming NO NO NO 130, 130, 130, 130
Sheet Metal – Roll Forming NO NO NO 60, 60, 50, 50
Sheet Metal – Stretch Forming NO NO NO 110, 110, 110, 110
Sheet Metal – Transfer Die NO NO NO 180, 180, 180, 180
Sheet Plastic NO NO NO 160, 160, 160, 160
Stock Machining NO NO NO (but see Machining) 220, 220, 220, 210
Surface Treatment NO NO YES 270, 260, 260, 250
User Guided NO NO NO 70, 70, 70, 70